Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from September 5th 2016

View All Posts
  • ISS Daily Summary Report – 09/05/2016

    Bigelow Expandable Activity Module (BEAM) Ingress and Sampling: Flight Engineer (FE)-6 Rubins ingressed the BEAM and collected the deployed Radiation Area Monitor (RAM) dosimeters and performed Microbial Air Sampler (MAS) and Surface Sample Kit (SSK) sampling. She also performed a thorough inspection of the walls and found no moisture.  The crew also replaced all of …