Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from 2014

View All Posts

    ISS Daily Summary Report – 10/02/14

    Possible Conjunction with Object #38971: Ground teams evaluated tracking data throughout the day for a possible conjunction with Object #38971. Time of Closest Approach (TCA) will be Friday, October 03, 10:51pm CDT.  A decision whether or not to perform a Debris Avoidance Maneuver will be made later this evening after additional tracking data is received. …

    Read Full Post

    ISS Daily Summary Report – 10/01/14

    FLame Extinguishment Experiment (FLEX)-2 Operations: Gerst removed the Combustion Integration Rack (CIR) alignment guides, isolating the rack and allowing ground teams to start another FLEX-2 test point via ground commanding. Drug Metabolism:  Wiseman inserted the Drug Metabolism Stow Bag (containing BioCells) into Commercial generic Bioprocessing Apparatus-4 (CGBA-4), reconfigured CGBA-4 power and data cables and opened …

    Read Full Post

    ISS Daily Summary Report – 09/30/14

    Rodent Research:  The Crew set up and configured the Microgravity Science Glovebox (MSG) and installed various tools, supplies, and equipment in preparation for future planned Rodent Research activities. Micro-8:  Gerst terminated Micro-8 Group Activation Packs (GAPs) C,D,E,F,G.  GAP’s D,E,F,G will be returned to Commercial Generic Biologic Apparatus -5  (CGBA-5) to await packing for SpaceX-4 return.  …

    Read Full Post

    ISS Daily Summary Report – 09/29/14

    Micro-8:  Over the weekend, Gerst terminated Micro-8 Group Activation Packs (GAPs) A & B.  GAP B was returned to Commercial Generic Biologic Apparatus -5 (CGBA-5) and GAP A was inserted into the General Laboratory Active Cryogenic ISS Experiment Refrigerator (GLACIER) frozen cold stowage.  Micro is a fundamental biology experiment that will expand our understanding of …

    Read Full Post

    ISS Daily Summary Report – 09/27/14

    Zebra Fish:  With the arrival of 40 Soyuz (40S), Wilmore transferred Zebrafish from the Fish Carrier to Fish fixation Aquariums to start the experiment in the Aquatic Habitat.  This experiment investigates if the atrophy of muscles under the condition of microgravity also occurs in zebrafish and why their atrophy occurs in the microgravity. Dosimeter Installation:  …

    Read Full Post

    ISS Daily Summary Report – 09/25/14

    40 Soyuz (40S) Launch and Dock:  40S launched from the Baikonur Cosmodrome at 3:25pm CDT today with Barry Wilmore, Elena Serova, and AlexanderSamokutyaev onboard. After orbital insertion, Mission Control Center Moscow confirmed that the port side solar array had not deployed. However, battery charging was sufficient with only one array (Starboard) deployed and the vehicle …

    Read Full Post

    ISS Daily Summary Report – 09/24/14

    SpaceX-4 Dragon Cargo Operations:  The crew began cargo operations today by removing the items located in the vehicle’s center stack. An estimated 55 hours of Crew time is required to complete cargo operations in the coming weeks. MICRO 8:  Gerst transferred the Commercial Generic Biologic Apparatus (CGBA), containing Micro-8 Group Activation Packs (GAPs) from Dragon …

    Read Full Post

    ISS Daily Summary Report – 09/23/14

    SpaceX-4 Dragon Capture, Berth, and Ingress: After a nominal Dragon rendezvous with ISS, the Crew successfully captured Dragon at 5:52am CDT utilizing the Space Station Remote Manipulator System (SSRMS).  The Dragon capsule was subsequently berthed to the Node 2 Nadir Port at 8:15am CDT. Once berthed, the Crew completed pressurization and outfitting of the Node …

    Read Full Post

    ISS Daily Summary Report – 09/22/14

    SpaceX-4 Launch:  Weather prevented SpaceX from launching their Falcon 9 Rocket on Saturday from Cape Canaveral’s Launch Complex 40.  After a 24 hour scrub, they were able to launch on Sunday at 12:52am CDT. Once in orbit, the spacecraft’s solar arrays were successfully deployed and its Guidance, Navigation and Control (GNC) bay door was opened.  …

    Read Full Post

    ISS Daily Summary Report – 09/19/14

    Ocular Health:   Gerst and Wiseman setup ultrasound-2 hardware for use in Gerst’s FD 120 (day 3 of 3) eye ultrasound exam.  The crew configured camera equipment, Ultrasound 2, and performed an echocardiogram with guidance from the Ocular Health ground team.  The Ocular Health protocol calls for a systematic gathering of physiological data to characterize the …

    Read Full Post