Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from July 2014

View All Posts

    ISS Daily Summary Report – 07/17/14

    Orbital-2 (Orb-2) Ingress:  Following yesterday’s successful capture and berthing of Cygnus, the crew completed vestibule outfitting, ingressed the vehicle, and began transferring cargo to ISS. Robonaut Operations: Commander (CDR) Swanson removed the Robonaut panels and battery backpack to gain access to the Robonaut processor and board. Tomorrow, Swanson will continue Robonaut operations. The Robonaut upgrades …

    Read Full Post

    ISS Daily Summary Report – 07/16/14

    Orbital-2 (Orb-2) Capture/Berthing: The crew successfully captured Cygnus using the Space Station Remote Manipulator System (SSRMS) at 5:39 am CDT. The ground used the Space Station Remote Manipulator System (SSRMS) to maneuver Cygnus into position near the Node 2 Nadir berthing port for Passive Common Berthing Mechanism (PCBM) inspection and berthing. Following berthing, the crew proceeded …

    Read Full Post

    ISS Daily Summary Report – 07/15/14

    Burning and Suppression of Solids (BASS)-II Operations: Flight Engineer (FE)-5 Wiseman completed two flame tests for the BASS-II investigation which examines the burning and extinction characteristics of a wide variety of fuel samples in microgravity. The experiment will guide strategies for materials flammability screening for use in spacecraft as well as provide valuable data on …

    Read Full Post

    ISS Daily Summary Report – 07/14/14

    Orbital-2 (Orb-2) Launch: Orb-2 launched successfully yesterday, achieved a nominal orbit and the solar array was successfully deployed.  Cygnus has executed several phasing burns to support rendezvous and grapple scheduled for Wednesday, July 16 at 5:39 am CDT followed by berthing to Node 2 (N2) Nadir.  The Orbital team is working through an issue with …

    Read Full Post

    ISS Daily Summary Report – 07/13/14 (Orbital Launch Status)

    Orbital-2 (Orb-2) Launch: Orb-2 launched successfully on Sunday, July 13 at 11:52 am CDT. Orb-2 achieved a nominal orbit and the solar array was successfully deployed.  Grapple is scheduled for Wednesday, July 16 at 5:39 am CDT followed by berthing to Node 2 (N2) Nadir.  Ingress is scheduled for Thursday, July 17.

    Read Full Post

    ISS Daily Summary Report – 07/11/14

    Orbital-2 (Orb-2) Launch: Launch is currently scheduled for Sunday, July 13 at 11:52 am CDT. Grapple is scheduled for Wednesday, July 16 at 5:37 am CDT followed by berthing to Node 2 (N2) Nadir.  Ingress is scheudled for Thursday, July 17. Force Shoes: Flight Engineer (FE)-5 Wiseman performed Treadmill 2 (T2) exercise using the Force …

    Read Full Post

    ISS Daily Summary Report – 07/10/14

    Capillary Flow Experiment (CFE) Interior Corner Flow (ICF) Test: Flight Engineer (FE)-6 Gerst set up hardware on the Maintenance Work Area (MWA) and conducted ICF test using the ICF8 hardware which contains a segmented, 50 degree snow cone section. CFE ICF studies capillary flow in interior corners of vessels with various geometries. Structured inside tanks …

    Read Full Post

    ISS Daily Summary Report – 07/09/14

    Burning and Suppression of Solids (BASS)-II Operations: FE-5 Wiseman conducted seven flame tests for the BASS-II investigation. Six of the samples were fabric and the seventh was an acrylic, spherical material. The BASS-II investigation examines the burning and extinction characteristics of a wide variety of fuel samples in microgravity. The BASS-II experiment will guide strategies …

    Read Full Post

    ISS Daily Summary Report – 07/08/14

    Burning and Suppression of Solids (BASS)-II Operations: Flight Engineer (FE)-5 Wiseman conducted six flame tests for the BASS-II investigation. Clear and black rods were burned under the same conditions for comparison. The BASS-II investigation examines the burning and extinction characteristics of a wide variety of fuel samples in microgravity. The BASS-II experiment will guide strategies …

    Read Full Post

    ISS Daily Summary Report – 07/07/14

    Radi-N2 Neutron Field Study (Radi-N2): Commander (CDR) Swanson deployed eight bubble detectors around the ISS for the Radi-N2 experiment. The objective of this investigation is to better characterize the ISS neutron environment and define the risk posed to the crewmembers’ health and provide the data necessary to develop advanced protective measures for future space flight. …

    Read Full Post