ISS Daily Summary Report – 10/11/2019
P6 Battery Extravehicular Activity (EVA) #2 (US EVA #57): Today, the ISS crew completed EVA #2 with the crew lock egress occurring around 6:38 am CT. Today’s EVA focused on completing the P6 Solar Array Channel 2B Li-Ion battery upgrades. This included installing the third and final Li-Ion battery to the Channel 2B IEA. The official EVA duration was 6 hours and 45 min. Tasks accomplished are as follows:
- Primary tasks:
- NiH2 Battery 4 from the Integrated Equipment Assembly (IEA) to the External Pallet (EP) Slot B.
- Adapter Plate (AP) B from the EP to Slot 4 on the IEA
- NiH2 Battery 6 from the IEA to AP-B Slot 4 on the IEA
- Li-Ion Battery D from the EP to Slot 6 on the IEA.
- NiH2 Battery 5 from the IEA to EP D.
- AP-D from the EP to Slot 5 on the IEA.
- Site 4B Worksite Prep
- Get ahead tasks completed:
- 4B NiH2 battery #5 H1 bolt torque release to support Robotics installation of spare Li-Ion battery.
- Disconnect of Ethernet Cables from EXT-EPIC MDMs.
- P6 WIF 7 & 9 inspections.
US Lab Intermodular Ventilation (IMV) Bypass Duct: Today, the crew completed the US Lab IMV bypass duct installation. This involved installing a Bypass Duct that will run through the LAB to send air from Node 3 directly to Node 2 in order to provide better air mixing across the USOS.
Payloads:
No major payload activities.
Completed Task List Activities:
No task-list items were completed.
Ground Activities:
All activities are complete unless otherwise noted.
- Payload Support Operations
- Mobile Servicing System EVA2 support
Look Ahead:
Saturday, 10/12 (GMT 284)
Payloads:
- Crew ½ Off-duty day
- VEG-04B Water Check (NASA)
Systems:
- EVA: P6 EVA Debriefs, OFVs, and EMU H2O recharge. S34B_E RPCM R&R robotics activities.
Sunday, 10/13 (GMT 285)
Payloads:
- Crew Off-duty day.
Systems:
- Crew Off-duty day. S34B_E RPCM R&R robotics activities.
Monday, 10/14 (GMT 286)
Payloads:
- NUTRISS BIA Measurement and questionnaire (ESA)
- VEG-04B Plant thinning and Water Check (NASA)
- Rodent Research-17 LSG Cleanup (NASA)
- Food Acceptability Survey (NASA)
- ISS HERA Reactivation (NASA)
- Analog-1 USB insert (ESA)
- ER6 Laptop Battery removal (NASA)
- ISS HAM pass (NASA)
Systems:
- S34B_E RPCM R&R robotics activities.
- HTV RSR Transfers
- T2 6 month maintenance
- IMV Flow Measure
- EVA- Procedure Review, Doug Review, Tool Config
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- External Wireless Instrumentation System Network Control Unit EVA Inhibit
- Extravehicular Activity (EVA) Reminder for EVA In-Suit Light Exercise (ISLE) Preparation
- IMS Delta File Prep
- Preparation of reports for Roscosmos website and social media
- Photography of removable handrails covers inside RS
- SCENARIY. Observation and photography of catastrophic events and their aftermath
- Photography of space behind SM panel
- ECON-M. Observation and Photography
- ISS HAM Radio Power Down in Columbus
- ISS HAM Radio Power Down in Service Module
- EVA COTS UHF Communication Unit (CUCU) Verify off
- USOS Extravehicular Activity (EVA) Communication Configuration
- Monitoring closure of shutters on SM windows 6, 8, 9, 12, 13, 14. Note 10
- ISS Crew and ГОГУ (RSA Flight Control Team) Weekly Conference (S-band)
- IMS Tagup (S-band)
- CONSTANTA-2. Cassette Retrieval from ТБУ-В and Setup on a panel for a 1-hour warmup
- Extravehicular Mobility Unit (EMU) Purge
- SEPARATION. Water distillation from urine in Urine Water Regeneration System [СРВ-У-РС]. Installation of cable-insert and activation. Voltage measurement test. Extravehicular Mobility Unit (EMU) In-Suit Light Exercise (ISLE) Pre-breathe
- CONSTANTA-2. Preparation and Execution 4.
- SEPARATION. Water distillation from urine in Urine Water Regeneration System [СРВ-У-РС]. Installation of cable-insert and activation. Voltage measurement test.
- SSRMS EVA Support Setup
- Crewlock Egress
- Worksite Preparation
- Move Adapter Plate B on EP to Slot 4 on IEA
- Move Battery 4 (IEA) to EP Slot B
- SSRMS EVA Support
- Tropical Cyclone Hardware Closeout
- IMS audit of КБО-М trash bags and dust collectors
- Filling (separation) of ЕДВ [КОВ] for Elektron or ЕДВ-СВ
- In Flight Maintenance – LAB IMV Bypass Duct Installation
- СОЖ maintenance
- Move Battery 6 on IEA to AP B slot 4 on IEA
- SEPARATION. Water distillation from urine in Urine Water Regeneration System [СРВ-У-РС].
- HRF Handle Kit Trash
- Release Battery 2
- COL1F3 Hardware Trash
- IMS audit of КБО-М trash bags and dust collectors
- Temperature and Humidity Control (THC) Common Cabin Air Assembly (CCAA) Swap
- Move Battery 5 to EP D
- Progress 442 (DC1) Cargo Transfers and IMS Ops
- HTV Foam Spacer Block Removal
- INTERACTION-2. Experiment Ops
- Cleanup channel 2B worksite
- Vacuum Cleaning of ВД1 and ВД2 air ducts in DC1
- Prepare 4B worksite for EVA 3
- EVA Crew Lock Ingress
- External Wireless Instrumentation System (EWIS) Network Control Unit (NCU) Enable
- Crewlock Pre Repress
- Evening Preparation Work
- Crewlock Repress
- Daily Planning Conference
- EVA Glove Photo Setup
- Extra Vehicular Activity (EVA) Post-EVA Activities
- EVA Glove Photo Downlink
- Photo/TV Extravehicular Activity (EVA) Camera Disassembly
- USOS Extravehicular Activity (EVA) Communication Deconfiguration
- Photo/TV Extravehicular Activity (EVA) GoPro Downlink
- Extravehicular Activity (EVA) Reminder for On-Orbit Fitcheck Verification (OFV)