Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

ISS Daily Summary Report – 1/10/2019

Vascular Echo: Crewmembers performed Scan and blood pressure measurements and took historical documentation photos in support of the Vascular Echo study. Cardiac and Vessel Structure and Function with Long-Duration Space Flight and Recovery (Vascular Echo) examines changes in blood vessels, and the heart, while the crew members are in space, and then follow their recovery on return to Earth. The results could provide insight into potential countermeasures to help maintain crewmember health, and quality of life for everyone.

Completed Task List Activities:

  • None

Ground Activities:
All activities are complete unless otherwise noted.

  • Nominal Ground Commanding

Two Day Look Ahead:

Friday, 01/11:
Payloads:

  • Rodent Health check (NASA)
  • STaARS BioScience-4 canister transfer to Dragon (NASA)

Systems

  • None

Saturday, 01/12: (Dragon pack and Hatch Closure)
Payloads:

  • Rodent Health check (NASA)

Systems

  • Dragon Center Stack Install
  • Dragon Egress
  • Dragon Unberth

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Actiwatch Plus HRF Rack 1 Setup
  • Actiwatch Plus HRF Rack 1 Stow
  • Countermeasures System (CMS) Advanced Resistive Exercise Device (ARED) Cylinder Flywheel Evacuation
  • Inventory Management System (IMS) Conference
  • JEM Northrop Grumman 10 Stowage Reconfiguration Closeout
  • JEM Northrop Grumman 10 Stowage Reconfiguration Preparation
  • JEM NG10 Stowage Reconfiguration
  • JEM Regenerative Heat Exchanger (RHX) Water Wipe
  • Meteor Hard Drive Diffraction Grating Config
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain Part 2
  • Rodent Research Transporter Health Check
  • Space Technology and Advanced Research Systems BioScience Experiment Container Installation
  • Vascular Echo 125min Scan – Subject
  • Vascular Echo CDL Holter Arterial BP Measurement – Subject
  • Vascular Echo Echo Ultrasound Setup and stow
  • Vascular Echo Historical Photo
  • Water Recovery Management (WRM) Water Balance Placeholder
  • Water Recovery and Management (WRM) Waste Water Bus (WWB) Split
  • X2R17 Software Transition Review
  • Cargo Transfer to Dragon
  • Turn on Регул-ОС
  • Video recorders check
  • ПФ1,ПФ2 dust filters and В1, В2 vent grids maintenance in MRM2
  • КОНТЕНТ. Выполнение эксперимента
  • ПИЛОТ-Т. Проведение эксперимента
  • Biochemical urine test
  • Medical equipment closeout
  • Замена сайлен-блока тренажера ВБ-3М
  • НС-1М install
  • СО1 ПФ1(2) dust filters cartridges replacement, fan B1(2) screen cleaning
  • Monitoring ИП-1 Air Flow Sensors