ISS Daily Summary Report – 08/07/14
Binary Colloidal Alloy Test (BCAT)-Canada 1 (C1) Image Transfer: Flight Engineer (FE)-5 Wiseman homogenized cuvette samples and took photos after mixing. He then set up the camera intervalometer. The BCAT-C1 sample contains a more viscous fluid, which requires more mixing on-orbit than previous samples. BCAT-KP provides a platform for material and industrial scientists to investigate colloid phase changes, providing results that may be used to develop new colloidal materials and formulations with unique properties. The results may support new applications, from new liquid crystals to consumer goods having longer shelf life and uses. BCAT-C1 studies nano-scale particles dispersed in liquid, known as a colloidal suspension, commonly found in such commercial commodities as paint, electronic polishing compounds and food products.
Robonaut Mobility Upgrades: Commander (CDR) Swanson installed new boards and processors into Robonaut, installed cables, and established communication connections. These upgrades are to support the installation of the Robonaut legs. Robonaut is a dexterous humanoid robot designed with the versatility and dexterity to manipulate hardware, exhibit greater endurance than humans and react safely when bumped or interacted with in a way that was not expected.
Multi-Purpose End-to-End Robotic Operations Network (METERON)-Operations and Communications (OpsCom) 2 Test: FE-6 Gerst executed a test between the METERON software on the ISS and a Eurobot Ground Prototype on the ground. One of the objectives of METERON-OpsCom 2 is to demonstrated control of a robot on a planetary surface by a human in an orbiting spacecraft.
Automated Transfer Vehicle (ATV) Rendezvous and Docking Simulator Proficiency 2: Gerst and FE-1 Skvortsov performed this training in preparation for ATV-5 docking planned for August 12. Following the activity, they discussed results in a conference with ground teams. They completed the first training session on Tuesday.
Extravehicular Activity Mobility Unit (EMU) 3011 Fan Pump Separator (FPS) Remove & Replace (R&R) Preparation: Yesterday Wiseman placed EMU 3011 on the forward EMU Don/Doff Assembly (EDDA) and reviewed R&R procedures. Today he gathered tools required for the task planned for later this month.
Cygnus Cargo Transfer Operations: Wiseman and Gerst continued transferring items to be trashed to the Cygnus vehicle.
Today’s Planned Tasks
- RSS1, 2, Reboot / r/g 1009 [Complete]
- Laptop RS1(2) Reboot [Complete]
- SM ПСС (Caution & Warning Panel) [Complete]
- Daily Planning Conference (S-band) [Complete]
- R2 – Camcorder Setup [Complete]
- CASKAD. Manual Mixing in Bioreactor / r/g 6238 [Complete]
- Re-installation of SM СТТС ПА amplifiers. r/g 6313 [Complete]
- ROBONAUT – Mobility Installation 5 [Complete]
- Gather EVA Equipment and Tools. r/g 6307 [Complete]
- HAM-VIDEO Powerdown [Complete]
- BCATC1. Sample Initialization and Photography [Complete]
- Specific EVA Procedure Review. r/g 6312 [Complete]
- SHD – Space Headaches Weekly Questionnaire[Complete]
- 24-hour BP Monitoring (terminate) r/g 6304 [Complete]
- Hand Ergometry Test То= 11:14. [Complete]
- DC1 EVA Support Panel (ПОВ) Test. [Complete]
- ПхО EVA Support Panel (ПОВ) Test. [Complete]
- Hand Ergometry Assesment. То= 12:48. [Complete]
- IMS Delta File Prep [Complete]
- SM СТТС ПА-3 Test. r/g 6313 [Complete]
- Cygnus Cargo Operations [Complete]
- ROBONAUT – Mobility Installation 6 [Complete]
- FPS Tool gather [Complete]
- EHS IV TEPC T/S [Complete]
- CSA/CP Zero Cal [Complete]
- Journal [Complete]
- WSTA Fill [Complete]
- ATV Rendezvous and Docking Simulator Proficiency No.2. r/g 6299, 6253 [Complete]
- IMS and Stowage Conference [Complete]
- 24-hour BP Monitoring (start) / r/g 6304 [Complete]
- CALCIUM. Experiment session 4. r/g 6306 [Complete]
- ATV Control Panel Relocation [Complete]
- SHD – Space Headaches Weekly Questionnaire [Complete]
- NAPOR-miniRSA. Testing of ТВМ1-Н Secondary Power Supply. r/g 6314 [Complete]
- Health Maintenance System (HMS) – Laptop setup for Ops [Complete]
- PEV Activation Test from ПхО EVA Support Panel. [Complete]
- Crew Prep for PAO [Complete]
- PEV Activation Test from DC1 ПОВ (EVA Support Panel). [Complete]
- PAO hardware setup in Columbus [Complete]
- Replacement and Labeling of СД1-7 Lights in DC1. r/g 6274 [Complete]
- СОЖ Maintenance [Complete]
- PAO Event [Complete]
- Binary Colloid Alloy Test – C1 Intervalometer Change 1 [Complete]
- METERON – Video Recording with Camcorder G1 [Complete]
- METERON – Communications Test [Complete]
- OCT Exam – Subject [Complete]
- OCT Exam – Operator [Complete]
- MATRYOSHKA-R. Monitoring Lulin-5 readings / r/g 4110 [Complete]
- Health Maintenance System (HMS) – Fundoscope Setup [Complete]
- OCT Hardware Stow [Complete]
- Fundoscope – Fundoscope Setup [Complete]
- Fundoscope – Eye Imaging, Subject [Complete]
- Fundoscope – Ocular Health (OH) – Assistance [Complete]
- ATV Rendezvous and Docking OBT Conference. [Complete]
- Daily Planning Conference (S-band) [Complete]
- CASKAD. Manual Mixing in Bioreactor / r/g 6238 [Complete]
- Fundoscope – Ocular Health (OH) – Equipment Stowage [Complete]
Task List
- ARED Cylinder Evac
- Earth Imagery
- WHC KTO replace
- WHC-ЕДВ-У R&R
- Roscosmos Report
- IWIS RSU check [Complete]
- SSCV5 USB Card Reader
- 3DA1 cam ops
- ARED detent flip
- Data prep return CDR, FE-1, FE-2
- Cygnus cargo ops
Ground
- Nominal commanding
Three-Day Look Ahead:
- Friday, 08/08: EVA tool transfer for RS EVA #39, Robonaut, ACTEX Cartridge R&R
- Saturday, 08/09: Crew off duty
- Sunday, 08/10: Crew off duty
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | Off |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | Off |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Stop |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Standby |
Urine Processing Assembly (UPA) | Norm |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full Up |