Due to the lapse in federal government funding, NASA is not updating this website.

Suggested Searches

Blogs

    ISS Daily Summary Report – 2/18/2017

    With the delay in SpaceX-10 launch, Monday will be an off duty day for the ISS crew.  There will be no IMC reports sent on Monday, February 20th. Nominal reporting will resume Tuesday morning.

    Read Full Post

    ISS Daily Summary Report – 2/17/2017

    NanoRack Cubesat Deployer (NRCSD) #10 Installation: This morning the crew installed two Quad deployers on the attachment mechanisms on the JEM Airlock (JEMAL) Slide Table. Only one Quad has satellites loaded, the second Quad is required for proper fit of the Multi-Layered Insulation (MLI) protective cover.  The deployment is scheduled for after the berthing and …

    Read Full Post

    Dragon Capture Training and Robonaut Power Check Today

    Expedition 50 Astronauts and Robonaut

    Three Expedition 50 crew members practiced today the robotic capture of the SpaceX Dragon resupply ship when it arrives at the International Space Station two days after its launch. A humanoid robot, better known as Robonaut, had its power supply checked out during a full day of troubleshooting. Commander Shane Kimbrough and Flight Engineer Thomas …

    Read Full Post

    ISS Daily Summary Report – 2/16/2017

    Transition to (X2) R15 Software:  As part of the R15 software transition, the Starboard 1 (S1) and Port 1 (P1) Multiplexer/Demultiplexers (MDMs) were transitioned to updated software S1P1 R6. Updates to the S1 and P1 MDMs include:  Longeron Fault Detection Isolation & Recovery (FDIR) updates to protect for Beta Gimbal Assembly (BGA) stall conditions Thermal …

    Read Full Post

    Commander Sets Up Dragon Gear and Looks to April Crew Swap

    Commander Shane Kimbrough

    The Expedition 50 crew is getting ready for the upcoming SpaceX CRS-10 mission to resupply the International Space Station. Commander Shane Kimbrough checked out SpaceX communications gear today so the astronauts can monitor the approach and rendezvous of the Dragon cargo craft. SpaceX is targeting Feb. 18 to launch its Dragon space freighter atop a …

    Read Full Post

    ISS Daily Summary Report – 2/15/2017

    Transition to (X2) R15 Software:  As part of the R15 software transition, the Payload (PL) Multiplexer/Demultiplexers (MDMs) were transitioned to updated software Payload Executive Processor R12 (PEP R12) today. Updates to the PL MDMs include:  Redundancy Management Time Reduction Additionally, the Lab-1 (LA-1) MDM was transitioned to Lab System-R5 (LSYS1-R5) software. Updates to the LA-1 …

    Read Full Post

    Station Gets New Software and Life Science Gear

    Astronauts Peggy Whitson and Thomas Pesquet

    The International Space Station is continuing to receive software updates to improve its spacecraft communications and navigation systems. Meanwhile, the astronauts today are setting up new life science gear and testing the docking ability of tiny internal satellites. New software is being uplinked and installed on the station this week to increase the communications and …

    Read Full Post

    ISS Daily Summary Report – 2/14/2017

    Transition to (X2) R15 Software:  As part of the R15 software transition, two of the three Command and Control (C&C) Multiplexer/Demultiplexers (MDMs) were transitioned to updated software today. Updates to the C&C MDMs include:  Visiting Vehicle Support Implement modified capability for loading patches Modification to Rapid Depress Auto-Response Dual Integrated Communications Unit (ICU) Capability Increase …

    Read Full Post

    Life Science Preps and Software Updates at Station

    Progress Resupply Ship Departs

    The Expedition 50 crew is getting the International Space Station ready for new experiments that will be delivered on the next SpaceX Dragon resupply mission. The station is also receiving a software update for its navigation and control systems. Dragon is set to deliver new research gear for a variety of experiments exploring the benefits …

    Read Full Post

    ISS Daily Summary Report – 2/13/2017

    Electrostatic Levitation Furnace (ELF) Sample Clean: This morning the crew disconnected the Sample Cartridges from within the ELF to exchange the samples and retrieve lost samples within the sample holders.  The crew reinserted the cartridge and reconnected the hoses and cables.  Ground teams will resume checkout and operations later this week. The ELF is an …

    Read Full Post