Due to the lapse in federal government funding, NASA is not updating this website.

Suggested Searches

Blogs

    Dragon Work, Space Research and Spacewalk Preps Today

    Expedition 63 Commander Chris Cassidy prepares to stow biological samples for preservation inside a science freezer.

    Two NASA astronauts aboard the International Space Station are getting ready for a pair of spacewalks set to begin at the end of June. Meanwhile, the Expedition 63 crew is still performing advanced space research to benefit Earth and space industries. Commander Chris Cassidy and Flight Engineer Bob Behnken are studying the tasks they will …

    Read Full Post

    ISS Daily Summary Report – 6/17/2020

    Payloads Repository: The crew performed Urine and blood collections in support of the Repository study. Repository supports scientific discovery that contributes to our fundamental knowledge in the area of human physiological changes and adaptation to a microgravity environment and provides unique opportunities to study longitudinal changes in human physiology spanning many missions. RED-EYE: The crew …

    Read Full Post

    Biology and Physics as Crew Enters BEAM, Preps for Spacewalk

    A waning gibbous Moon is pictured just above the Earth's horizon on June 7, 2020.

    Tuesday’s science aboard the International Space Station encompassed life science, fluids and flames to help humans on Earth and in space. The Expedition 63 crew also configured spacewalk tools and opened up an expandable module. Commander Chris Cassidy of NASA collected and stowed his blood and urine samples today for later analysis. He also set …

    Read Full Post

    ISS Daily Summary Report – 6/16/2020

    Payloads Capillary Driven Microfluidics: The crew configured the Light Microscopy Module (LMM) in preparation for Microfluidics science runs. The crew also took photos of overall view of ACE Module capillaries and each capillary (three) for closer view during removal. Capillary-Driven Microfluidics in Space (Capillary Driven Microfluidics) examines the drawing of fluids into a tiny narrow …

    Read Full Post

    Rocket Motors for First NASA Artemis Moon Mission Arrive at Spaceport

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    The rocket booster segments that will help power NASA’s first Artemis flight test mission around the Moon arrived at the agency’s Kennedy Space Center in Florida on Monday for launch preparations. All 10 segments for the inaugural flight of NASA’s first Space Launch System (SLS) rocket and Orion spacecraft were shipped by train from Promontory, Utah. The …

    Read Full Post

    NASA’s Perseverance Rover Comes Together for Mars Mission

    Continuing on its path to preparation for next month’s launch, NASA’s Mars Perseverance rover spacecraft is, well, put together. Inside the Payload Hazardous Servicing Facility at the agency’s Kennedy Space Center in Florida, the Backshell-Powered Descent Vehicle and Entry Vehicle assemblies are now attached to Perseverance. The cone-shaped backshell contains the parachute, and along with …

    Read Full Post

    ISS Daily Summary Report – 6/15/2020

    Payloads REDEYE:  The crew installed the RED-EYE 2 satellite onto the Japanese Module (JEM) KABOR deployer system on the JEM Airlock slide table. The crew also replaced the old capture mechanism with a new unit and took the multilayer insulation (MLI) from the old unit and installed it onto the new capture mechanism unit. The …

    Read Full Post

    Crew Starts Week With Spacewalk Preps, Satellite Work

    Russia's Progress 74 resupply ship

    The Expedition 63 crew is starting the week getting ready for a pair of upcoming spacewalks and a satellite deployment. The International Space Station residents are also setting up research gear that will analyze hazardous particles and plasma crystals. The three NASA astronauts onboard the station teamed up today setting up hardware and reviewing plans …

    Read Full Post

    SLS Aft Skirts for Artemis I Move Out of Booster Fabrication Facility

    The first of two aft skirts for Artemis I for NASA's Space Launch System solid rocket boosters is moved from the BFF.

    Inside the Booster Fabrication Facility at NASA’s Kennedy Space Center in Florida, the Artemis I aft skirts for the agency’s Space Launch System (SLS) rocket’s twin solid rocket boosters are being readied for their move to the Rotation, Processing and Surge Facility (RPSF). In view, the left aft skirt assembly is attached to a move …

    Read Full Post

    Kathy Lueders to Helm NASA’s Human Spaceflight Office

    Kathy Lueders, participates in a postlaunch news conference inside the Press Site auditorium at the agency’s Kennedy Space Center in Florida on May 30, 2020, following the launch of NASA’s SpaceX Demo-2 mission to the International Space Station.

    NASA Administrator Jim Bridenstine on Friday selected Commercial Crew Program Manager Kathy Lueders to be the agency’s next associate administrator of the Human Exploration and Operations (HEO) Mission Directorate. Since 2014, Lueders has directed NASA’s efforts to send astronauts to space on private spacecraft, which culminated in the successful launch of Demo-2 from the Kennedy …

    Read Full Post