Suggested Searches

Blogs

    Station Crew Helping Future Orion Explorers

    The International Space Station

    The International Space Station is providing a research platform today to help future astronauts navigate deep space in the Orion Multi-Purpose Crew Vehicle. The Expedition 58 crew is also testing new lights and setting up the orbital lab for CubeSat deployments. NASA is planning deep space missions with its new Orion spacecraft that will rely …

    Read Full Post

    ISS Daily Summary Report – 1/28/2019

    Electro-static Levitation Furnace (ELF): Over the weekend, a crewmember installed ELF cartridge unit 001. ELF is an experimental facility designed to levitate, melt and solidify materials by containerless processing techniques using the electrostatic levitation method. With this facility thermophysical property of high temperature, melts can be measured and solidification from deeply undercooled melts can be …

    Read Full Post

    Crew Tests Time Perception in Space and Real-Time Vital Signs Monitoring

    NASA astronaut Anne McClain

    The Expedition 58 astronauts explored time perception and tested a wearable body monitor aboard the International Space Station today. The orbital residents also packed a U.S. space freighter and set up tiny satellites controlled by students on Earth. Astronauts Anne McClain and David Saint-Jacques started Monday in the Columbus lab module learning how microgravity affects …

    Read Full Post

    ISS Daily Summary Report – 1/25/2019

    ISS Experience setup and recording: The crew set up the hardware in Node 1, recorded themselves with The ISS Experience Z- Cam answering questions from the ISS Experience Astronaut Log, then moved the ISS Experience hardware to Node 2. Questions were related to the astronaut’s personal experience, adaptation to life in space, and space exploration. …

    Read Full Post

    Cargo Ship Takes out Trash; Crew Works on Cygnus Preps and Science Hardware

    Jan. 25, 2019: International Space Station Configuration

    A Russian cargo ship left the International Space Station this morning and was deorbited for a destructive demise over the Pacific Ocean. The Expedition 58 crew now turns its attention to the departure of a U.S. space freighter next month. The Progress 70 (70P) resupply ship ended its six-and-a-half month stay at the station when …

    Read Full Post

    Russian Cargo Ship Undocks; U.S. Cygnus Leaves in February

    Russian ISS Progress 70 cargo craft

    A Russian Progress 70 (70P) cargo craft undocked from the International Space Station today at 7:55 a.m. EST loaded with trash and discarded gear. It will orbit Earth a few more hours before reentering the Earth’s atmosphere over the Pacific Ocean for a fiery but safe destruction. The Progress delivered three tons of food, fuel …

    Read Full Post

    ISS Daily Summary Report – 1/24/2019

    FIR/LMM/Biophysics-5-2 Plate Installation: The crew installed Biophysics Plate s/n 2002 onto the PACE (Preliminary Advanced Colloids Experiment) LED Base inside the FIR/LMM (Fluids Integrated Rack/Light Microscopy Module) AFC (Auxiliary Fluids Container) and dispensed oil on the plate.  LMM/Biophyscs-5-2 looks at the relationship between solution convection – the movement of molecules through the fluid – and …

    Read Full Post

    ISS Daily Summary Report – 1/23/2019

    Materials ISS Experiment Flight Facility (MISSE-FF) Troubleshooting: Performed as planned ground-commanded troubleshooting, today a file downlink attempt was made on the MISSE Science Carrier-11 (MSC-11). This was not successful and the engineering team will assess the errors reported during the attempt. Also as part of the troubleshooting, MSC-9 was powered-up and its power profile monitored …

    Read Full Post

    BEAM Stowage, Medical Procedures Review and Commercial Crew Update

    Nighttime view of the Earth's limb with an aurora

    The Expedition 58 crew opened up the International Space Station’s “closet” today stowing hardware inside the experimental module. The three orbital residents also reviewed medical emergency procedures and NASA’s Commercial Crew Program announced a crew update Tuesday. The Bigelow Experimental Activity Module (BEAM) had its stay extended at the orbital lab in November of 2017. …

    Read Full Post

    ISS Daily Summary Report – 1/22/2019

    Fluid Shifts: In support of the final day of Fluid Shifts operations, the crew performed a Chibis (lower body negative pressure) Imaging session. The video issues experienced yesterday did not occur today and the ground teams report today’s session occurred nominally. Fluid Shifts is a NASA investigation, divided into Dilution Measurements, Baseline Imaging, and Baseline …

    Read Full Post