CONSTRUCTION AND REMODELING OF THE ALTITUDE WIND TUNNEL AWT CONTROL ROOM – VACUUM PUMP HOUSE – VACUUM NOZZLES – VACUUM CHAMBER
Installation of the 31-foot diameter bulkhead near the southeast corner which separated the two SPC chambers within the former wind tunnel (11/28/1961).
Image Credit: NASA/MARTIN BROWN