
Artemis I Orion
In the Operations and Checkout Building (O&C) at Kennedy Space Center, three spacecraft adapter jettison (SAJ) fairings are prepared for installation and will be moved into place by technicians with Lockheed Martin, lead contractor for Orion on Oct. 12, 2020. They will be secured around the spacecraft, encapsulating the European Service Module to protect it from the harsh environment as the spacecraft is propelled out of Earth’s atmosphere atop the Space Launch System (SLS) rocket during NASA’s Artemis I mission. The next time the solar array wings will be visible will be when Orion is in space. Artemis I will test the Orion spacecraft and SLS as an integrated system ahead of crewed flights to the Moon.
Image Credit: NASA / Radislav Sinyak
- X
https://www.nasa.gov/image-detail/amf-jsc2022e046082/
TakenOctober 12, 2020
ProducerJSC
Image CreditNASA / Radislav Sinyak
Size1920x1281px
PIA Numberjsc2022e046082