Business jet sonic boom signature test.
Mars Science Laboratory pressure model being tested for entry to the Martian atmosphere.
Space Launch System booster separation testing.
1956 test of the Bell X-2 in Test Section 2.
1956 test of the North American X-15 in Test Section 2.
1959 visit by the Mercury Seven astronauts to observe testing of the Mercury capsule.
Test of the Orion Launch Abort System configuration using pressure sensitive paint.
Drag reduction testing on a supersonic transport design.
Astronaut Drew Feustel is pictured outside of the Tranquility module during a spacewalk on May 16 to swap thermal control…
Astronaut Drew Feustel is pictured outside of the International Space Station during a spacewalk on May 16 to swap thermal…