Suggested Searches

1 min read

Mission Control Center, Gemini Program

Mission Control Center, Gemini Program
For Gemini missions, changes were made in the existing console lineup in the Flight Control Area. Two consoles were added on the left side of the room that faced inward, and on the right side of the room, a fifth plot board was added to the row of four from Project Mercury.

For Gemini missions, changes were made in the existing console lineup in the Flight Control Area. Two consoles were added on the left side of the room that faced inward, and on the right side of the room, a fifth plot board was added to the row of four from Project Mercury. This photograph dates to the Gemini I test flight on April 6, 1964

Image Credit: NASA