Strata-1 Payload Activation: Earlier this morning Peake moved the Space Acceleration Measurement System (SAMS) sensor enclosure from the Japanese Experiment Module (JEM) to the Strata-1 payload for activation and checkout activities. When Peak switched the main power switch on, an overcurrent trip occurred on the Solid State Power Control Module (SSPCM) channel for Express Rack …
ISS Daily Summary Report – 04/1/16
Read Full Post