ISS Daily Summary Report – 11/3/15
Observation Analysis of Smectic Islands in Space (OASIS) Sample Exchange: Kononenko performed an OASIS sample exchange today, installing the fourth of four sample cartridges into the experiment hardware housed in the Microgravity Science Glovebox (MSG). OASIS studies the unique behavior of liquid crystals in microgravity, including their overall motion and the merging of crystal layers known as smectic islands. Liquid crystals are used for display screens in televisions and clocks, and they also occur in soaps and in cell membranes. The experiment allows detailed studies of the behavior of these structures, and how microgravity affects their unique ability to act like both a liquid and a solid crystal.
Cognition: Lindgren performed his Flight Day 103 session of the Cognition experiment. Individualized Real-Time Neurocognitive Assessment Toolkit for Space Flight Fatigue (Cognition) is a battery of tests that measure how spaceflight-related physical changes, such as microgravity and lack of sleep, can affect cognitive performance. Cognition includes ten brief computerized tests that cover a wide range of cognitive functions, and provides immediate feedback on current and past test results. The software allows for real-time measurement of cognitive performance while in space.
Journals: Kelly completed a Journals entry today. The Journals investigation obtains information on behavioral and human issues that are relevant to the design of equipment and procedures used during astronauts during extended-duration missions. Study results provide information used in preparation for future missions to low-Earth orbit and beyond.
Extravehicular Activity (EVA) Preparation: The US Crew prepared for the P6 Return To Original Configuration (RTOC) EVA scheduled for Friday, November 6th. Today, they reviewed procedures and Ammonia related refresher material, then followed up with a conference with ground specialists to answer any questions. In addition, Kelly and Lindgren configured EVA tools and installed new Long Life Batteries and Metal Oxide Cartridges onto the Extravehicular Mobility Units.
Today’s Planned Activities
All activities were completed unless otherwise noted.
- USOS EVA Procedure Review
- CARDIOVECTOR. Experiment Ops
- EMU LLB/METOX Battery Replacement
- OASIS – Sample Swap
- В3 Fan Screen Cleaning in MRM2
- USOS EVA Tool Configuration
- MOTOCARD. Experiment Ops
- Transfer of Thermal Protection Jackets [ТЗК] from ISS to Soyuz 717
- SODF – Update
- Vacuum Cleaning of ВД1 and ВД2 air ducts in MRM2
- WRS – Recycle Tank Fill
- EML – Reprogramming Cable Installation
- HAM radio session from Columbus
- USOS EVA – Ammonia Decontamination Refresher
- КЛ-121/122Ц Monoblock test in PCE mode (digital signal reception from MRM1 КЛ-108/109Ц monoblock)
- Repair of SM Interior Panel 316 by Installing Overlay Panel – Day 2
- On MCC GO Replacing [РТ-50-1М] current controller No.2 (А202) – Demating connectors Х4,Х5,Х6,Х2,Х3
- USOS EVA Procedure Conference
- СОЖ maintenance
- On MCC GO Demating [РТ-50-1М] telemetry connectors from БКС
- Changeout of [РТ-50-1М] No.2 (А202)
- CIR – Post-Experiment Hardware Stowage
- CALCIUM. Experiment session 12
- WRS – Recycle Tank Fill
- JRNL – Journal Entry
- TV conference with Mayak Radio Station Correspondent
- Transfer of Thermal Protection Jackets [ТЗК] from ISS to ТК 718
- PAO Hardware Setup
- Replacement of ПФ1, ПФ2 Dust Filters and Cleaning В1, B2 Fan Screens in MRM2 (ФГБ1ПГО_4_419_1 bag 429-16 (00068131R)
- Waste and Hygiene Compartment (WHS) Pre-Treat Tank and Pre-Treat Tank Hose Remove & Replace
- INTERACTION-2. Experiment Ops
- On MCC GO Mating РТ-50-1М telemetry connectors to БКС
- IMS Delta File Prep
- [РТ-50-1М] (А202) R&R – Closeout Ops
- EML – Cable Removal
- Daily Planning Conference (S-band)
- COGN – Experiment Ops and Filling Questionnaire
- Preparation of Reports for Roscosmos Web Site and Social Media
- ECON-M. Observation and Photography
- URAGAN Observations and Photography
Completed Task List Items
- Replace KTO
- Move LAB Wall Clock (iPad) Power Location
- CCE – Cinespace
Ground Activities
All activities were completed unless otherwise noted.
- Nominal System Commanding
Three-Day Look Ahead:
Wednesday, 11/04: EVA QD Training, EVA Tool Config, Capillary Flow Experiment, SPHERES
Thursday, 11/05: 1/2 Duty Day, EVA Procedure Review, Pre EVA PHS, Equipment Lock Prep
Friday, 11/06: P6 RTOC EVA
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | Off |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Shutdown |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Standby |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full Up |