Advanced Colloids Experiment (ACE)-M-2 Sample Mixing: Commander (CDR) Swanson mixed ACE-M-2 samples in preparation for sample analysis which will take place in the Fluids Integrated Rack (FIR) at a later date. In the ACE-M-2 investigation, a model colloidal system is used to observe the microscopic behavior of liquids and gases separating from each other, near the critical point, via a process called spinodal decomposition.
In Flight Maintenance (IFM): Swanson performed a Waste and Hygiene Compartment (WHC) flush tank fill and depressurized the flush water tank and water valve block to protect the dose pump.
Public Affairs Office (PAO) Event: Swanson participated in a PAO event with middle and high school students. Topics included research being conducted on the ISS and what types of tasks are performed during space walks.
Today’s Planned Tasks
- RSS1,2 Reboot / r/g 1009 [Complete]
 - Laptop RS1(2) Reboot [Complete]
 - SM ПСС (Caution & Warning Panel) Test [Complete]
 - Daily Planning Conference [Complete]
 - Terminate EMU METOX Regeneration [Complete]
 - OTKLIK. Equipment setup r/g 5684 [Complete]
 - Start EMU Metox Regeneration [Complete]
 - SM Ventilation System Preventive Maintenance. Group В1 [Complete]
 - Flushing ТКГ 421 (AO) Rodnik БВ2 Tank Connectors / r/g 5686 [Complete]
 - On MCC Go Urine Transfer from EDV-U to ТКГ 421 Rodnik БВ1 tank (AO) / r/g 5686 [Complete]
 - ACE. OBT Review [Complete]
 - ACE. Sample 60-Minute Mixing [Complete]
 - ACE. Sample 50-Minute Mixing [Complete]
 - ACE. Sample 40-Minute Mixing [Complete]
 - Filling (separation) of EDV [KOB] for Elektron from ТКГ 427 r/g 5638 [Complete]
 - Replace СМОК set between СК1 and СБК1. r/g 5664 [Complete]
 - WRS Water Sample Analysis [Complete]
 - VEG – Daily Plant Check [Complete]
 - VEG – Plant Water Refill [Complete]
 - СОЖ Maintenance [Complete]
 - VEG – Weekly Plants Photo [Complete]
 - WHC Fill [Complete]
 - ИП-1 Flow Sensor Position Check / Pressure Control & Atmosphere Monitoring System [Complete]
 - On-orbit Hearing Assessment using EARQ [Complete]
 - Replace Condensate Removal Lines set from СК1 to ВУ СРВ-К2М. r/g 5664 [Complete]
 - ТКГ 421 Stowage Ops / r/g 5685 [Complete]
 - JRNL – Journal Entry [Complete]
 - MELF1 – Insert Ice Bricks [Complete]
 - Dust Filter Replacement and MRM1 Gas-Liquid Heat Exchanger (ГЖТ) Cleaning [Complete]
 - MELFI3. Ice Brick Insertion into MELF3 [Complete]
 - PAO Hardware Setup [Complete]
 - TOCA Data Recording [Complete]
 - Daily Planning Conference [Complete]
 - IMS Update
 - Crew Prep for PAO [Complete]
 - PAO Event [Complete]
 
Task List
- ARED Cylinder Evac
 - WHC EDV-U R&R
 - Roscosmos Report
 - Ekon Photo
 - IFM-WHC UR/IF R&R
 - 39S CMS pre-gather
 - 3DA1-Cam-Ops
 - ARED Dashpot inspect
 - CEVIS Isolator MOD
 - Cygnus pre-gather
 - EMU 3005 Photos
 - EMU LLB Auto-Init
 - EMU LLB SSC Relocate
 - EMU LLB SSC Return
 - EVA ORU Bag Inspection
 - IFM MOOT restow
 - IFM NOD1OS2 LHA R&R
 - IFM NOD1PD2 LHA R&R
 - PEPS Inspect
 - No-skid tape audit
 - NOD3 PEPS assessment
 - P/TV Hardware questions
 - POSSUM PL Photo
 - PMM cleanup
 - Viable Crew OBT
 - Viable PL Photo
 - Viable PL Touch
 - WMRS MRF Remove
 
Ground
- Nominal commanding
 
Three-Day Look Ahead:
- Thursday, 05/22: MSL SCA Exchange, Resist Tubule Prep, MELFI Ice brick install
 - Friday, 05/23: Crew half duty, Sprint BP/ECG, Resist Tubule samples, move CLPA from SSRMS boom to MBS mast
 - Saturday, 05/24: Crew day off, VEG-01 daily check
 
QUICK ISS Status – Environmental Control Group:
| Component | Status | 
| Elektron | On | 
| Vozdukh | Manual | 
| [СКВ] 1 – SM Air Conditioner System (“SKV1”) | On | 
| [СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off | 
| Carbon Dioxide Removal Assembly (CDRA) Lab | Override | 
| Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate | 
| Major Constituent Analyzer (MCA) Lab | Stop | 
| Major Constituent Analyzer (MCA) Node 3 | Operate | 
| Oxygen Generation Assembly (OGA) | Process | 
| Urine Processing Assembly (UPA) | Norm | 
| Trace Contaminant Control System (TCCS) Lab | Off | 
| Trace Contaminant Control System (TCCS) Node 3 | Full up | 
			