ISS Daily Summary Report – 05/17/14
Double Cold Bag (DCB) Packing: ISS CDR Swanson and FE-1 Skvortsov packed six DCBs with conditioned science samples for return on SpaceX-3.
SpaceX-3 Departure Preparations: Swanson completed the final SpaceX-3 cargo loading. He then completed the SpaceX-3 egress and vestibule closeout procedures, including installation of the Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPAs). Finally, he configured the Robotics Work Station (RWS) cameras. SpaceX-3 unberth is scheduled at 6:40am CDT tomorrow with release scheduled at 8:26am CDT.
CBM Bolt 3-1 Checkout: After Swanson installed the CBM CPAs, the ground team checked out CBM Bolt 3-1, which had failed during SpaceX-3 berthing operations and was subsequently changed out. The bolt was fully retracted to confirm the initial configuration. It was then driven and retracted to verify nominal operation. Bolt 3-1 will be masked to support SpaceX-3 demate.
Today’s Planned Tasks
- SM Caution and Warning Panel (ПСС) [Complete]
 - Laptop RS1(2) reboot [Complete]
 - RSS1,2 reboot r/g 1009 [Complete]
 - Daily Planning Conference (S-band) [Complete]
 - Double Cold Bag Procedure review for Dragon [Complete]
 - OTKLIK. Installation area prep. Tagup with specialist r/g 5654 [Complete]
 - Double Cold Bag Packing to Dragon [Complete]
 - BLB – Checking Biolab Laptop Connection
 - DRAGON Transfer Ops [Complete]
 - СОЖ Maintenance [Complete]
 - Dragon Egress [Complete]
 - Telephone conference with “Russian Cosmos” magazine editor / r/g 5669 [Complete]
 - Dragon – Hatch Closure [Complete]
 - Dragon Vestibule Configuration for Demate [Complete]
 - CPA installation [Complete]
 - Connecting DCP Power Cable for RWS in Cupola and LAB [Complete]
 - Camera Setup to View LAB Remote (RWS) Monitor 3 [Complete]
 - CGBA-4 Powerdown [Complete]
 - CGBA-6 Powerdown [Complete]
 - Daily Planning Conference (S-band) [Complete]
 - VEG – Daily Plant Check [Complete]
 - Video recording for Roscosmos TV studio / r/g 5667
 - USOS Window Shutter Close
 
Task List
- ARED Cylinder Evac
 - WHC EDV-U R&R
 - Roscosmos Report
 - Test Operation of МИС on ISS RS
 - Ekon Photo
 - CTB 1048 Relocate
 - Dragon Temp Logger Find [In work]
 - 3DA1-Cam-Ops
 - EMU 3005 Photos
 - EMU LLB Auto-Init
 - EMU LLB SSC Relocate
 - EMU LLB SSC Return
 - EVA ORU Bag Inspection
 - MOOT restow
 - NOD1OS2-LHA R&R
 - NOD1PD2-LHA R&R
 - PEP Inspection
 - WHC UR/IF R&R
 - KTO EDV Audit
 - NOD3 PEPS assessment
 - P/TV Hardware questions
 - POSSUM PL Photo
 - Viable Crew OBT
 - Viable PL Photo
 - Viable PL Touch
 - WMRS MRF Remove
 
Ground
- Nominal commanding
 - SpaceX-3 configuration for unberth [Complete]
 - CBM CPA checkout and Bolt 3-1 verification [Complete]
 
Three-Day Look Ahead:
- Sunday, 05/18: Dragon release 8:26am CDT
 - Monday, 05/19: Crew off duty, Resist Tubule MELFI insert, RADIN
 - Tuesday, 05/20: OGA H2 sensor R&R, SpaceX-3 debrief, MELFI Ice brick install
 
QUICK ISS Status – Environmental Control Group:
| Component | Status | 
| Elektron | On | 
| Vozdukh | Manual | 
| [СКВ] 1 – SM Air Conditioner System (“SKV1”) | Off | 
| [СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off | 
| Carbon Dioxide Removal Assembly (CDRA) Lab | Standby | 
| Carbon Dioxide Removal Assembly (CDRA) Node 3 | Standby | 
| Major Constituent Analyzer (MCA) Lab | Stop | 
| Major Constituent Analyzer (MCA) Node 3 | Operate | 
| Oxygen Generation Assembly (OGA) | Standby | 
| Urine Processing Assembly (UPA) | Standby | 
| Trace Contaminant Control System (TCCS) Lab | Off | 
| Trace Contaminant Control System (TCCS) Node 3 | Full up | 
			

