Suggested Searches

Blogs

    ISS Daily Summary Report – 05/07/15

    Bone Densitometer (BD) Imaging On-orbit Replacement Unit (ORU) Remove and Replace (R&R): Following a failed checkout of the BD, ground controllers determined that the Imaging Unit had failed. Cristoforetti R&R’ed the unit today in advance of Rodent Research sample collections next Monday. Ground controllers successfully calibrated the unit and are ready to proceed with Rodent Research …

    Read Full Post

    Crew Wraps Up Atmospheric Maintenance

    Kelly and Virts Work on CDRA

    Maintenance and experiment work continued on Thursday for the Expedition 43 crew. NASA astronauts Terry Virt and Scott Kelly finished the work they’ve been doing on one of the station’s Carbon Dioxide Removal Assemblies (CDRA.) The CDRA system works to remove carbon dioxide from the cabin air, allowing for an environmentally safe crew cabin. Virts …

    Read Full Post

    ISS Daily Summary Report – 05/06/15

    Gene, Immune and Cellular Responses to Single and Combined Space Flight Conditions – A (Triplelux-A): Cristoforetti installed the three Triplelux Reservoir A into the Automatic Ambient Stowage (AAS) inserts. She retrieved the second Culture Tube A from Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI), thawed it in the Biolab glovebox and installed it in …

    Read Full Post

    Maintenance and Departure Preps Continue on Wednesday

    Maintenance and experiment work continued on Wednesday for the Expedition 43 crew. NASA astronaut Terry Virt spent the second consecutive day replacing components inside one of the station’s Carbon Dioxide Removal Assemblies (CDRA.) The CDRA system works to remove carbon dioxide from the cabin air, allowing for an environmentally safe crew cabin. Virts also did …

    Read Full Post

    ISS Daily Summary Report – 05/05/15

    Gene, Immune and Cellular Responses to Single and Combined Space Flight Conditions – A (Triplelux-A): Cristoforetti continued operations for run two of two of Triplelux-A. She installed the Experiment Container (EC) in the Biolab Left Rotor (Rotor L) and activated the run. Triplelux-A uses a rat macrophage cell line to investigate and compare the ability …

    Read Full Post

    The 2015 Eta Aquarid Meteor Shower

    1037759main_eta.jpg

    Each spring as Earth passes through the debris trail from Halley’s Comet (1P/Halley), the cosmic bits burn up in our atmosphere and result in the annual Eta Aquarid meteor shower. This year the peak will occur on May 6 about 9 AM EDT with meteor rates of about 30 meteors per hour near peak. Best …

    Read Full Post

    Maintenance and Departure Prep Today For Expedition 43

    NASA astronauts Terry Virts and Scott Kelly spent the day replacing components inside one of the station’s Carbon Dioxide Removal Assemblies (CDRA.) The CDRA system works to remove carbon dioxide from the cabin air, allowing for an environmentally safe crew cabin. ESA astronaut Samantha Cristoforetti continued two experiments that are investigating how the body changes …

    Read Full Post

    ISS Daily Summary Report – 05/04/15

    Robotics Refueling Mission (RRM) Operations: Over the weekend, the Special Purpose Dexterous Manipulator (SPDM) picked up Task Board 2 (TB2) and the Safety Cap Tool (SCT) from the RRM. The Mobile Transport (MT) was translated to Work Site (WS) 7 where the SPDM stowed TB2 and the Safety Cap Tool on the RRM On-orbit Transfer Cage …

    Read Full Post

    Robotics, Skin Studies and Moon Imagery Kick Off Crew Week

    Monday began a new week of science and maintenance work for the Expedition 43 crew. NASA astronauts Terry Virts and Scott Kelly spent the day reviewing procedures and gathering equipment for an upcoming replacement activity with one of the station’s Carbon Dioxide Removal Assemblies (CDRA.) The CDRA system works to remove carbon dioxide from the …

    Read Full Post

    ISS Daily Summary Report – 05/01/15

    USOS Crew Half Duty Day: Today was a half duty day for the USOS crew. This was payback for the weekend Dragon arrived and the crew performed vehicle arrival activities including critical cargo transfer. NeuroMapping:  Following a control pad connection to the HRF laptop, Virts launched the NeuroMapping application and completed all the tests. The …

    Read Full Post