Suggested Searches

Blogs

    ISS Daily Summary Report – 10/25/2016

    Veg-03 Initiation: FE-3 configured and installed the Vegetable Production System (Veggie) on the Maintenance Work Area (MWA) and then installed six Small Plant Pillows to hold the ‘Outredgeous’ red romaine lettuce plants.  Ground teams plan to grow the lettuce plants for two months, with four harvests planned.  The overall goal of Veg-03 is to further …

    Read Full Post

    NASA Prepares for Orion Water Recovery Rehearsal in Pacific Ocean

    The test version of the Orion crew module was transported into the well deck of the USS San Diego at Naval Base San Diego in California on Oct. 21 to prepare for Underway Recovery Test 5.

    When Orion returns from deep space missions and lands in the ocean, a team will be responsible for safely returning the capsule and crew back to land. NASA’s Ground Systems Development and Operations Program and U.S. Navy personnel are preparing to conduct a water recovery test, called Underway Recovery Test 5 (URT-5), this week, using a …

    Read Full Post

    Crew Prepping Station for Lettuce Crops

    NASA Astronaut Shane Kimbrough

    The newly-expanded Expedition 49 crew is getting ready to grow lettuce to learn how to grow fresh food in space. Meanwhile, the International Space Station is getting ready for another crew swap. New station crew member Shane Kimbrough is installing hardware and plant pillows for the Veg-03 plant growth experiment. The study is a validation …

    Read Full Post

    First Half of Platform B Arrives for NASA’s Space Launch System

    First half of Platform B arrives at Kennedy Space Center.

    The first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, arrived by heavy-load transport truck at the agency’s Kennedy Space Center in Florida on Oct. 21. The B platforms are the ninth of 10 levels of new platforms for High Bay 3 in the Vehicle Assembly Building (VAB). …

    Read Full Post

    ISS Daily Summary Report – 10/24/2016

    Bigelow Expandable Activity Module (BEAM) Ingress and Sampling: FE-6 stowed the Advanced Resistive Exercise Device (ARED) then opened Node3 Aft hatch to ingress the BEAM.  Once inside, the crew collected Microbial Air Sampler (MAS) and Surface Sample Kit (SSK) microbial and surface samples and deployed the Radiation Area Monitors (RAMs) delivered on 48Soyuz (48S).  The …

    Read Full Post

    ISS Daily Summary Report – 10/23/2016

    Cygnus Rendezvous and Capture:  This morning the crew monitored the Cygnus approach from the Cupola Robotic Workstation and successfully captured Cygnus using the Space Station Remote Manipulator System (SSRMS) at 6:28 am CDT.  The Ground Robotics team maneuvered Cygnus into position to inspect the Passive Common Berthing Mechanism (CBM), and berthed Cygnus onto the Node-1 …

    Read Full Post

    Cygnus Attached to Station’s Unity Module

    Space Station Configuration

    Orbital ATK’s Cygnus cargo spacecraft was berthed to the Unity module of the International Space Station at 10:53 a.m. EDT. The Expedition 49 crew will begin unloading approximately 5,000 pounds of science investigations, food and supplies when the hatch between the newly arrived spacecraft and the Unity module of the space station is opened. The …

    Read Full Post

    Station Robotic Arm Grapples Cygnus Resupply Ship

    The Cygnus Resupply Ship

    Expedition 49 Flight Engineers Takuya Onishi of the Japan Aerospace Exploration Agency and Kate Rubins of NASA successfully captured Orbital ATK’s Cygnus spacecraft with the station’s robotic arm at 7:28 a.m. EDT. NASA TV coverage of operations to install Cygnus to the space station’s Unity module begins at 9 a.m. Get weekly video highlights at: http://jscfeatures.jsc.nasa.gov/videoupdate/

    Read Full Post

    ISS Daily Summary Report – 10/21/2016

    48 Soyuz (48S) Dock: 48S launched from the Baikonur Cosmodrome on Wednesday, October 19th, and docked to the ISS this morning bringing Ryzhikov, Borisenko, and Kimbrough to the ISS. Docking to the Mini Research Module-2 (MRM-2) module was completed at 4:53 am CDT with hatch opening at 7:20 am CDT. Today’s docking increases the ISS …

    Read Full Post

    Orion Service Module Umbilical Testing Wraps Up at Launch Equipment Test Facility

    OSMU testing is complete at the Launch Equipment Test Facility at Kennedy Space Center.

    Testing of the Orion Service Module Umbilical (OSMU) is complete at the Launch Equipment Test Facility at NASA’s Kennedy Space Center in Florida. A series of tests, called regressions tests, were performed on the umbilical’s design modifications to validate it for installation on the mobile launcher. The tests were conducted by Kennedy’s Engineering Directorate for …

    Read Full Post