Suggested Searches

Blogs

    More Oxygen Generator Work as Soyuz Nears Launch

    The Soyuz MS-03 spacecraft

    The three Expedition 50 crew members today are working on an oxygen generator and setting up gear to photograph the Earth and meteors. In Kazakhstan, the Soyuz spacecraft that will launch the next trio to the International Space Station is being processed at its launch facility. Commander Shane Kimbrough was back at work this morning …

    Read Full Post

    ISS Daily Summary Report – 11/08/2016

    Veg-03 Operations: The crew checked and photo documented the status of the plants in the Veggie facility, and evaluated the plant pillows to determine if additional watering is required.  The overall goal of Veg-03 is to further demonstrate proof-of concept for the Veggie plant growth chamber and the planting pillows using ‘Outredgeous’ Red Romaine lettuce.  …

    Read Full Post

    Crew Sets up for Earth and Radiation Studies Before Next Trio Launches

    Western Libya

    The Expedition 50 trio orbiting on the International Space Station is conducting maintenance while getting ready for Earth observations and radiation exposure studies today. In Kazakhstan, three new crew members are waiting as their Soyuz rocket is prepared for launch. Commander Shane Kimbrough started work on the U.S. segment’s Oxygen Generation System (OGS), which will …

    Read Full Post

    ISS Daily Summary Report – 11/07/2016

    Sally Ride Earth Knowledge Acquired by Middle Schools (EarthKAM): The crew configured the camera, laptop and associated Sally Ride EarthKAM software at the Node 2 Nadir hatch window. Once configured, the EarthKAM team, in association with middle school students around the world, selected image targets which will be downlinked and used in the study of …

    Read Full Post

    ISS Daily Summary Report – 11/04/2016

    Human Research Program (HRP) Collections: The crew continued a urine collection session today and performed the first blood draw in support of the Biochemical Profile and Repository experiments. Collected samples are placed in Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) for return at a later date. The Biochemical Profile experiment tests blood and …

    Read Full Post

    ISS Daily Summary Report – 11/03/2016

    Orbital ATK (OA)-5 Cargo Operations:  Today, CDR continued transferring cargo from Cygnus to ISS. Afterwards, CDR participated in a cargo conference with ground specialists. At last report approximately 9.5 hours of cargo operations had been completed and an estimated 16 hours of operations remaining.  Human Research Program (HRP) Collections: CDR began 24-hour urine collections this …

    Read Full Post

    New Trio Settles In Before Next Crew Launches

    Expedition 50-51

    A new set of Expedition 50 crew members is in Kazakhstan just two weeks away from a launch to the International Space Station. The three orbiting station inhabitants are in the second week of their four-month stay in space. Thomas Pesquet, Peggy Whitson and Oleg Novitskiy have tried on their spacesuits and checked out the …

    Read Full Post

    ISS Daily Summary Report – 11/02/2016

    Group Combustion Leak Check: CDR retrieved the Combustion Chamber from the Multi-Purpose Small Payload Rack (MSPR) Work Volume and installed a top plate on the Combustion Chamber.  The crew then installed a gas bottles and air supply lines to configure for a leak check.  Ground specialists are focusing the leak check on the Group Combustion …

    Read Full Post

    Station Trio Continues Research, Awaits New Crewmates

    Expedition 50-51 Crew Members

    The new Expedition 50 crew is in its first week aboard the International Space Station after a trio of Expedition 49 crew members left for Earth Saturday night. Commander Shane Kimbrough and Flight Engineers Sergey Ryzhikov and Andrey Borisenko are the sole occupants of the station right now awaiting three more crewmates due to launch …

    Read Full Post

    ISS Daily Summary Report – 11/01/2016

    Extravehicular Mobility Unit (EMU) Maintenance:  The crew performed a half water dump and fill on EMU 3006 feedwater tanks and a full water dump and refill of EMUs 3003 and 3010 feeedwater tanks. These activities satisfy maintenance requirements for on-orbit stowage of the EMUs.  Urine Processing Assembly (UPA):  Last week, the crew demated the connection …

    Read Full Post