Suggested Searches

Blogs

    ISS Daily Summary Report – 7/09/2021

    Payloads Expedite the Processing of Experiments to Space Station (EXPRESS) Rack 4 (ER4) International Subrack Interface Standard (ISIS) Drawer Check: Following an Iceberg-1 noise reported by the crew in early July, the issue was determined to be caused by a loose ISIS drawer lid in the location just below the Iceberg-1 unit. The crew attempted …

    Read Full Post

    ISS Daily Summary Report – 7/08/2021

    SpaceX-22 Undock and Return: Cargo Dragon SpaceX-22 (SpX-22) undocked from the ISS today at 9:45 AM CT to return cargo and payloads to the ground concluding the 33-day mission aboard the ISS. SpX-22 will complete departure phasing through Friday evening, jettison the Trunk carrying the empty ISS Power Augmentation (IPA) for destructive re-entry, deorbit, and …

    Read Full Post

    Cargo Dragon Departs Station, Returns to Earth Friday

    July 8, 2021: International Space Station Configuration. Four spaceships are docked at the space station including the SpaceX Crew Dragon and Russia's Soyuz MS-18 crew ship and ISS Progress 77 and 78 resupply ships.

    With NASA astronaut Shane Kimbrough  monitoring aboard the International Space Station, a SpaceX cargo Dragon spacecraft undocked from the International Docking Adapter on the station’s space-facing port of the Harmony module at 10:45 a.m. EDT. Dragon will fire its thrusters to move a safe distance from the space station during the next 36 hours. On …

    Read Full Post

    Dragon Undocking Planned Thursday, Crew Focuses on Space Research

    The SpaceX Cargo Dragon vehicle approaches the space station on June 5, 2021. At center right, the SpaceX Crew Dragon spacecraft is also pictured docked to the Harmony module.

    SpaceX CRS-22 undocking is planned for Thursday, July 8 at 10:35 a.m. EDT, with NASA TV coverage scheduled to begin at 10 a.m. NASA and SpaceX flight control teams continue to monitor the weather and splashdown locations. Certain parameters like wind speeds and wave heights must be within certain limits to ensure the safety of …

    Read Full Post

    ISS Daily Summary Report – 7/07/2021

    Payloads Astrobee/SoundSee: The crew participated in a crew conference, set up the appropriate hardware, and initiated the SoundSee science session. Investigation of Deep Audio Analytics on the ISS (SoundSee Mission) tests monitoring of the acoustic environment using an audio sensor on Astrobee, a mobile robotic platform aboard the space station. Microphones collect acoustic information, and …

    Read Full Post

    Artemis I Rocket Grows Closer to Launch

    Teams with NASA’s Exploration Ground Systems and contractor Jacobs integrate the interim cryogenic propulsion stage (ICPS) for NASA’s Space Launch System (SLS) rocket with the launch vehicle stage adapter (LVSA) atop the massive SLS core stage in the agency’s Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on July 5, 2021.

    Leerlo en español aquí. The Artemis I mission reached another milestone this week inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center. On July 5, teams with Exploration Ground Systems and contractor Jacobs stacked the interim cryogenic propulsion stage (ICPS) atop the Space Launch System (SLS) rocket. The ICPS’s RL 10 engine is housed …

    Read Full Post

    Weather Delays Dragon Undocking, Crew Scans Veins for Health Checks

    Astronauts Shane Kimbrough and Megan McArthur will monitor the SpaceX Cargo Dragon's arrival on Sunday.

    Due to forecast extreme weather off the coast of Florida, SpaceX CRS-22 undocking is no longer planned for Wednesday, July 7. NASA and SpaceX flight control teams continue to monitor the weather and splashdown locations and are prepared to support undocking of the Dragon cargo spacecraft once conditions are safe to do so. Certain parameters …

    Read Full Post

    ISS Daily Summary Report – 7/06/2021

    Payloads Collapsible Contingency Urinal (CCU) Demo: The crew performed multiple handheld fill and drain cycles of the CCU using fruit punch as a test fluid. The ground team guided and observed the operations to analyze performance characteristics and observe fluid dynamics and stability of liquid in the system. The CCU is exploration hardware flown to …

    Read Full Post

    ISS Daily Summary Report – 7/05/2021

    Payloads Electrostatic Levitation Furnace (ELF): The crew performed the steps necessary to gain access to the internal areas of ELF, change out the sample holder, and replace a gas bottle. JAXA’s ELF is an experimental facility designed to levitate, melt and solidify materials by container-less processing techniques using the electrostatic levitation method. With this facility, …

    Read Full Post