Suggested Searches

Blogs

    ISS Daily Summary Report – 8/29/2022

    Payloads: Airborne Particulate Monitor (APM): Experiment data was transferred from the APM for subsequent downlink to the ground. Air quality in crewed spacecraft is important for keeping astronauts healthy and comfortable. Although requirements exist for maximum allowable concentrations of particulate matter, currently no measurement capability verifies whether these requirements are met. The APM demonstrates an …

    Read Full Post

    Crew Studies Muscles, Skin Healing During Spacewalk Preps

    The sun's glint beams off the Indian Ocean in this photograph from the space station as it soared 260 miles above.

    Space biology kicked off the week for the Expedition 67 crew on Monday to help NASA and its international partners support astronauts on long spaceflight missions. Two cosmonauts are also preparing for a spacewalk to continue outfitting the International Space Station’s third robotic arm. NASA Flight Engineers Kjell Lindgren and Bob Hines began Monday morning …

    Read Full Post

    Launch Attempt Scrubbed

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    The launch director halted today’s Artemis I launch attempt at approximately 8:34 a.m. EDT. The Space Launch System rocket and Orion spacecraft remain in a safe and stable configuration. Launch controllers were continuing to evaluate why a bleed test to get the RS-25 engines on the bottom of the core stage to the proper temperature …

    Read Full Post

    Teams Continue to Hold While Data Gathering Continues

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Teams are in a hold in the countdown at T-40 minutes while engineers evaluate why the bleed test to condition the engines was not successful. Engineers are looking at options to gather as much data as possible. The Artemis I rocket and spacecraft are in a stable, safe condition.

    Read Full Post

    Engineers Troubleshooting Engine Conditioning Issue

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    While liquid oxygen loading into the interim cryogenic propulsion stage continues and core stage tanks continue to be replenished with propellants, engineers are troubleshooting an issue conditioning one of the RS-25 engines (engine 3) on the bottom of the core stage. Launch controllers condition the engines by increasing pressure on the core stage tanks to …

    Read Full Post

    Core Stage Fueling in Replenish, Go for Upper Stage LOX Loading

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    The Space Launch System’s core stage liquid oxygen (LOX) and liquid hydrogen (LH2) tanks are fully fueled and both are being replenished. During replenish, the propellant that naturally boils off is being replaced to ensure the tanks are at full capacity for launch. A “go” has been given for liquid oxygen loading into the interim …

    Read Full Post

    Core Stage Propellant Loading Continues, Teams Go for Upper Stage Tanking

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    As teams continue to fuel the Space Launch System (SLS) rocket’s core stage with liquid oxygen (LOX) and liquid hydrogen (LH2), teams have been given a go to begin propellant loading operations for the rocket’s interim cryogenic propulsion stage (ICPS). The ICPS is the upper stage of the rocket responsible for giving the Orion spacecraft the …

    Read Full Post

    Engineers Troubleshoot Core Stage Liquid Hydrogen Leak in Mating Interface

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    During the transition from slow fill of liquid hydrogen into the Space Launch System rocket’s core stage to fast fill operations, launch controllers saw a spike in the amount of hydrogen that is allowed to leak into the purge can, a housing covering the tail service mast umbilical’s quick disconnect, or mating interface with the …

    Read Full Post