Suggested Searches

Blogs

    Artemis I WDR Update: Third Test Attempt Concluded

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Teams concluded today’s wet dress rehearsal test at approximately 5:10 p.m. EDT after observing a liquid hydrogen (LH2) leak on the tail service mast umbilical, which is located at the base of the mobile launcher and connects to the rocket’s core stage. The leak was discovered during liquid hydrogen loading operations and prevented the team …

    Read Full Post

    ISS Daily Summary Report – 4/14/2022

    Private Astronaut Mission (PAM) Axiom-1: Public Affairs Office (PAO), Payload, and Commercial Activities: Multiple NASA-sponsored and ESA-sponsored PAO events have been performed, including eight Ice Cube Media Set events, three Ham radio events, and three PAO events, including a duet in space between Mike LA and the neoclassical pianist BLKBOK. The Ax-1 crew completed activities …

    Read Full Post

    Station Ramps Up for Crew Swap and Spacewalk Preps

    The Sun's light glints off the Atlantic Ocean in this photograph from the International Space Station as it orbited 262 miles above.

    NASA and SpaceX are preparing for a Commercial Crew swap taking place this month at the International Space Station. Meanwhile, the Axiom Mission 1 (Ax-1) astronauts are staying busy as two cosmonauts gear up for a pair of spacewalks outside the orbiting lab’s Russian segment. Two Commercial Crew missions are getting ready to trade places …

    Read Full Post

    Artemis I WDR Update: Core Stage Liquid Oxygen Loading Operations Resume

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    After troubleshooting an issue with the temperature of liquid oxygen during early stages of propellant loading into the rocket’s core stage, launch controllers have resumed operations. Teams performed chill down operations again before liquid oxygen began flowing into the tank and adjusted pump speeds as necessary during flow to help ensure temperatures remain below limits. …

    Read Full Post

    Artemis I Update: Core Stage Liquid Oxygen Chilldown Underway 

    The launch control team has begun chill down operations and resumed the countdown clock ahead of flowing super cold liquid oxygen (LOX) into the core stage tank.  The new T-0 time for today’s test is 3:57 p.m. EDT for the first of the two terminal count runs for the wet dress rehearsal.   The process …

    Read Full Post