Suggested Searches

Black and white image of the the Multi Axis Spin Test Inertia Facility device for astronaut training.

Multi-Axis Space Inertia Test Facility inside the Altitude Wind Tunnel

C-1960-53137 4/13/1960 The Multi-Axis Space Test Inertial Facility (MASTIF) in the Altitude Wind Tunnel at the National Aeronautics and Space Administration (NASA) Lewis Research Center. Although the Mercury astronaut training and mission planning were handled by the Space Task Group at Langley Research Center, NASA Lewis played an important role in the program, beginning with the Big Joe launch. Big Joe was a singular attempt early in the program to use a full-scale Atlas booster and simulate the reentry of a mockup Mercury capsule without actually placing it in orbit. The design and creation of the boilerplate capsule was performed at both Langley and Lewis. Lewis was responsible for the electronics, attitude control system, and assembly of the final capsule. A unique three-axis gimbal rig was built inside Lewis' Altitude Wind Tunnel to test Big Joe's attitude controls. The control system was vital since the capsule would burn up on reentry if it were not positioned correctly. The mission was intended to assess the performance of the Atlas booster, the reliability of the capsule's attitude control system and beryllium heat shield, and the capsule recovery process. The September 9, 1959 launch was a success for the control system and heatshield. Only a problem with the Atlas booster kept the mission from being a perfect success. The MASTIF was modified in late 1959 to train Project Mercury pilots to bring a spinning spacecraft under control. An astronaut was secured in a foam couch in the center of the rig. The rig then spun on three axes from 2 to 50 rotations per minute. Small nitrogen gas thrusters were used by the astronauts to bring the MASTIF under control.

Download