Suggested Searches

KSC-97PC1561

In preparation for Space Shuttle Mission STS-87, the orbiter Columbia is lifted into high bay 3 in the Vehicle Assembly Building. The orbiter will be mated to the external tank and solid rocket boosters over the weekend and is slated to roll out to Pad 39B on Wednesday. STS-87 will be the fourth flight of the United States Microgravity Payload and the Spartan-201 deployable satellite

Download