Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from 2022

View All Posts

    ISS Daily Summary Report – 1/25/2022

    Payloads: Acoustic Diagnostics: The crew executed the Acoustic Diagnostics software to perform AUDIO measurements in the Columbus module. The Acoustic Upgraded Diagnostics In-Orbit (AUDIO) investigation tests the hearing of ISS crew members before, during, and after flight. This study (Acoustic Diagnostics) assesses the possible adverse effects of noise and the microgravity environment aboard the ISS …

    Read Full Post

    ISS Daily Summary Report – 1/24/2022

    SpaceX-24 Undock and Return: Due to unfavorable weather conditions at the landing site, Cargo Dragon SpaceX-24 (SpX-24) undock was delayed two days from the original departure date of January 21st. The vehicle undocked from the ISS yesterday at 9:40 AM CT to return cargo and payloads to the ground concluding the 33-day mission aboard the …

    Read Full Post

    ISS Daily Summary Report – 1/21/2022

    Payloads: AstroPi: The crew adjusted the back focus of the AstroPi 5 mm camera lens and set the aperture to 8.  This was performed for the AstroPi unit currently mounted in the Node 2 nadir window.  The current Astro Pis are a very recent upgrade and replacement for the original Astro Pi hardware that flew …

    Read Full Post

    ISS Daily Summary Report – 1/20/2022

    Payloads: Micro Monitor: A 350 ml water sample was collected from the Potable Water Dispenser (PWD) to be returned to the ground for analysis. Development of the On-board Monitoring System for Microorganisms in Potable Water on Manned Spacecraft (Micro Monitor) examines a high-performance, real-time system for monitoring spacecraft water systems. It uses an ultraviolet light and …

    Read Full Post

    ISS Daily Summary Report – 1/19/2022

    Russian Segment (RS) Extravehicular Activity (EVA) #51: During today’s EVA, the Russian crew worked outside the Multipurpose Laboratory Module (MLM) to complete the below tasks. The USOS crew assisted with the Airlock operations in the Service Module (SM). The following tasks were completed and deferred during the EVA: Completed: Installation of NM Handrail Limiters (2 …

    Read Full Post

    ISS Daily Summary Report – 1/18/2022

    Payloads: Crew Interactive MObile companioN (CIMON): The crew performed the appropriate steps to prepare a bootable disk for a CIMON software load. The Pilot Study with CIMON is a technology demonstration project, and an observational study, that aims to obtain the first insights into the effects on crew support by an artificial intelligence (AI), in …

    Read Full Post

    ISS Daily Summary Report – 1/17/2022

    Payloads: Analyzing Interferometer for Ambient Air-2 (ANITA-2): The crew assisted with the initial power-up of the ANITA-2 system by closing switches and adjusting a video camera to monitor the unit.  Following this, the ground was unable to successfully ping the unit and is discussing the issue.  ANITA-2 is a compact gas analyzer which can analyze …

    Read Full Post

    ISS Daily Summary Report – 1/14/2022

    Payloads: Advanced Nano Step: The Advanced Nano Step experiment return bag was transferred to a MERLIN unit in preparation for return to the ground for analysis. Advanced Nano Step, more formally known as Effects of Impurities on Perfection of Protein Crystals, Partition Functions, and Growth Mechanisms, monitors and records how the incorporation of specific impurity …

    Read Full Post

    ISS Daily Summary Report – 1/13/2022

    Payloads: AstroPi: After moving an AstroPi from Columbus to a Node 2 window, the focus and aperture were adjusted for the 5mm camera lens. This was performed during ISS orbital day to make sure the camera was viewing the Earth. Two augmented Raspberry Pi computers (called AstroPis) were originally flown to the ISS as part …

    Read Full Post

    ISS Daily Summary Report – 1/12/2022

    ISS Reboost: Today, the ISS performed a reboost using the aft 79 Progress thrusters. The purpose of this reboost is to set up the phasing conditions for the 80 Progress 34-Orbit rendezvous in February and begin to set up the phasing conditions for the 66 Soyuz landing and 67 Soyuz launch in March. The burn …

    Read Full Post