Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from 2022

View All Posts

    ISS Daily Summary Report – 7/06/2022

    Payloads: Airborne Particulate Monitor (APM): Science data from the APM memory card was transferred to a Station Support Computer (SSC) for subsequent downlink, and the display status was reported to the ground. Air quality in crewed spacecraft is important for keeping astronauts healthy and comfortable. Although requirements exist for maximum allowable concentrations of particulate matter, …

    Read Full Post

    ISS Daily Summary Report – 7/05/2022

    NRAL Trash Deploy: On Saturday, the Flight Control Team performed the first trash deploy utilizing the Nanoracks Airlock (NRAL). The deploy demonstrated the trash deployment capability by executing the jettison of a disposable bag containing approximately 26.5 CTBE (78.1 kg) of dry common trash. The Space Station Remote Manipulator System (SSRMS) grappled NRAL and demated …

    Read Full Post

    ISS Daily Summary Report – 7/01/2022

    Payloads: Behavioral Core Measures (BCM): The crew performed a BCM research session consisting of a set of 12 runs/tests. The Standardized Behavioral Measures for Detecting Behavioral Health Risks during Exploration Missions (Behavioral Core Measures) experiment initially examined a suite of measurements to reliably assess the risk of adverse cognitive or behavioral conditions and psychiatric disorders …

    Read Full Post

    ISS Daily Summary Report – 6/30/2022

    Payloads: Actiwatch: The actiwatches were doffed, connected to a USB hub for charging and data management, and then returned to the appropriate crewmembers for donning. The Actiwatch is a waterproof, non-intrusive, sleep-wake activity monitor worn on the wrist of a crewmember and contains a miniature uniaxial accelerometer that produces a signal as the subject moves. …

    Read Full Post

    ISS Daily Summary Report – 6/29/2022

    Payloads: Autonomous Medical Officer Support (AMOS): The crew set up the appropriate hardware, logged into the AMOS application, and performed several ultrasound science scans. As missions venture farther from Earth, astronauts need the capability to diagnose and treat acute medical conditions without ground support. The AMOS Software Demonstration, for which data collection is now complete, …

    Read Full Post

    ISS Daily Summary Report – 6/28/2022

    Northrup Grumman 17 (NG-17) Cygnus Departure: Today, Cygnus was unberthed from the Node 1 Nadir Common Berthing Mechanism (CBM) using the Space Station Remote Manipulator System (SSRMS), then maneuvered to the release position, and released for departure at 6:06 AM CT. Cygnus, filled with waste/trash from the space station packed by the crew, is scheduled …

    Read Full Post

    ISS Daily Summary Report – 6/27/2022

    Northrup Grumman 17 (NG-17) Cygnus Reboost: On Saturday June 25th, the ISS successfully performed a reboost using Cygnus Delta Velocity (∆V) Engine (DVE) starting at 17:27 GMT with a posigrade burn duration of 5 min and 1 sec resulting in a ∆V of 0.3 m/s and a delta altitude (∆H) of 0.54 km. The Cygnus …

    Read Full Post

    ISS Daily Summary Report – 6/24/2022

    Payloads: Cell Biology Experiment Facility (CBEF-L): The CBEF Vent Fan Cable Checkout was completed. CBEF-L is a JAXA new subrack facility, which is an upgraded facility of the original CBEF currently aboard the ISS.  CBEF-L provides new capabilities with additional new resources such as Full High Definition video interface, Ethernet, 24 VDC power supply, and …

    Read Full Post

    ISS Daily Summary Report – 6/23/2022

    Payloads: BioLab: The Biological Experiment Laboratory in Columbus (Biolab) centrifuge rotor A and B belts were replaced, and reference Experiment Containers (ECs) were installed into the Biolab facility. The rotor belt replacement is a periodic maintenance activity. The multiuser research facility is used to perform space biology experiments on microorganisms, cells, tissue cultures, small plants, …

    Read Full Post

    ISS Daily Summary Report – 6/22/2022

    European Robotic Arm (ERA) Operations: Today, by successfully grappling to base point 3, the ERA Mission 2 was completed. ERA Mission 2 was intended to be completed during RS Extravehicular Activity (EVA) # 53 which occurred in April; however, ERA was unable to complete the grapple to base point 3. In this position, ERA is …

    Read Full Post