Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from April 30th 2019

View All Posts

    ISS Daily Summary Report – 4/30/2019

    Main Bus Switching Unit (MBSU) 3 Status: Following yesterday’s MBSU 3 failure, troubleshooting was not successful and the Flight Investigation Team (FIT) determined MBSU 3 is failed.  The crew and ground teams coordinated the install of the Node 1 Y-Jumper and Node 1 Contingency Power Jumper and removal of the Node 1 Channel 2 and …

    Read Full Post