Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from February 2016

View All Posts

    ISS Daily Summary Report – 02/29/16

    Change of Command Ceremony: Today, the ISS Crew participated in a Change of Command Ceremony. During this ceremony Expedition 46 Commander Scott Kelly handed over command of the ISS to Expedition 47 Commander Tim Kopra.   Kelly, Volkov, and Kornienko will be returning to earth tomorrow evening onboard Soyuz 44.   Integrated Resistance and Aerobic Training …

    Read Full Post

    ISS Daily Summary Report – 02/26/16

    Burning and Suppression of Solids (BASS)-II: Kopra completed flame tests for the BASS-II investigation.  BASS-II examines the burning and extinction characteristics of a wide variety of fuel samples in microgravity. The results of the BASS-II experiment will be used in the development of strategies for flammability screening of materials to be used in spacecraft as …

    Read Full Post

    ISS Daily Summary Report – 02/25/16

    Airway Monitoring:  Kopra and Peake completed a European Space Agency (ESA) Airway Monitoring session which began this morning when the crewmembers assembled a Lithium Hydroxide (LIOH) canister and portable fan assembly to prepare for carbon dioxide removal in the US Airlock.  Subsequently, Nitric Oxide (NO) measurements were taken of both crewmembers at nominal and reduced …

    Read Full Post

    ISS Daily Summary Report – 02/24/16

    Water Process Assembly (WPA) Status:  Following yesterday’s WPA Catalytic Reactor replacement, the WPA successfully completed a process cycle and is working nominally.  In addition, the crew returned Treadmill 2 (T2) and Water Recovery System (WRS)-1 Racks back to their nominal configuration.   Airway Monitoring:  Peake completed setup of a camera and hardware for Airway Monitoring …

    Read Full Post

    ISS Daily Summary Report – 02/23/16

    Space Automated Bioproduct Laboratory (SABL):  Today, for the NASA SABL facility,  Peake set up two SABL units in in the US Laboratory module and configured power, data, and thermal connections to the rack.  SABL is an upgrade to the long standing ISS incubator, Commercial Generic Bioprocessing Apparatus (CGBA). SABL supports a wide variety of experiments in …

    Read Full Post

    ISS Daily Summary Report – 02/22/16

    Cygnus Destructive Re-Entry:   On Saturday, Cygnus completed its De-Orbit Delta-V (DDV)-1 burn at 4:32 am CST.  The spacecraft then crossed the Entry Interface and destructively re-entered the atmosphere at approximately 9:53 am CST.   Urine Processing Assembly UPA Status:  On Sunday, UPA faulted out due to belt slippage between the distillation assembly and its motor.  …

    Read Full Post

    ISS Daily Summary Report – 02/19/16

    Cygnus Departure:  Today, Robotics Ground Controllers used the Space Station Remote Manipulator System (SSRMS) to unberth Cygnus from the Node 1 nadir berthing port and maneuvered the spacecraft to its release position.  Kopra and Kelly subsequently released Cygnus at 6:26 am CST and monitored its nominal departure.   Cygnus is scheduled for a destructive re-entry tomorrow, …

    Read Full Post

    ISS Daily Summary Report – 02/18/16

      Preparation for Cygnus Unberth and Release:  The Crew has configured Cygnus and the Node 1 vestibule in preparation for Cygnus departure tomorrow. This morning, the Crew removed Intermodule Ventilation, Power/Data Jumpers, and closed the Cygnus hatch.  Once the hatch was closed, the Crew installed the Common Berthing Mechanism (CBM) Center Disk Cover and four …

    Read Full Post

    ISS Daily Summary Report – 02/17/16

    Biological Rhythms 48-Hour:  Kelly began his third and final Biological Rhythms experiment today, preparing and starting the Actiwatch and donning a Holter Monitor to collect Electrocardiogram (ECG) measurements for 48 hours.  Biological Rhythms 48 hours studies the effects of long-term microgravity exposure on heart function by analyzing an astronaut’s electrocardiogram for 48 hours. While the …

    Read Full Post

    ISS Daily Summary Report – 02/16/16

    Burning and Suppression of Solids – Milliken (BASS-M):  Today Kopra completed the final session of BASS-M operations, preparing and testing different samples with ground assistance from the Principal Investigator.  The BASS-M investigation tests flame-retardant cotton fabrics to determine how well they resist burning in microgravity. Results benefit research on flame-retardant textiles that can be used …

    Read Full Post