Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from November 2015

View All Posts

    ISS Daily Summary Report – 11/30/15

    Cygnus Offset Grapple On-Board Training (OBT):  In preparation for Cygnus arrival planned for December 6th, the USOS crew practiced vehicle captures with the Space Station Remote Manipulator System (SSRMS) which was located at the Permanent Multipurpose Module (PMM) Flight Releasable Grapple Fixture (FRGF) High Hover position in preparation for the training. Following the training, the …

    Read Full Post

    ISS Daily Summary Report – 11/27/15

    EXPRESS (EXpedite the PRocessing of Experiments to Space Station) Rack 8 Laptop Software Load:  Kelly supported the ongoing software updates to ISS EXPRESS Rack laptops by copying a software load to the EXPRESS Rack 8 laptop.  These software updates include enhanced security with the Windows 7 operating system, new features and support for new capabilities. …

    Read Full Post

    ISS Daily Summary Report – 11/25/15

    Robonaut 2 Troubleshooting:   Lindgren continued troubleshooting Robonaut’s Compact Peripheral Component Interface today.    Robonaut 2 is a two-armed humanoid robot designed with the versatility and dexterity to manipulate hardware, work in high risk environments, and respond safely to unexpected obstacles. Robonaut is currently mounted inside the ISS.  In the future, it will perform tasks both inside …

    Read Full Post

    ISS Daily Summary Report – 11/24/15

    Sprint Ultrasound:  Kelly performed his Flight Day 240 thigh and calf ultrasound scans today with assistance from Lindgren and guidance from the Sprint ground team.  Ultrasound scans are used to evaluate spaceflight-induced changes in the muscle volume. The Sprint investigation evaluates the use of high intensity, low volume exercise training to minimize loss of muscle, …

    Read Full Post

    ISS Daily Summary Report – 11/23/15

    Microgravity Science Glovebox (MSG) Troubleshooting:  Kelly and Lindgren attempted to restore full functionality to the slide mechanism that allows the MSG work volume to be extended for crew access but were not successful.  The MSG Ground Team is working with a ground unit to develop additional procedures for correcting the problem.  The slide mechanism initially …

    Read Full Post

    ISS Daily Summary Report – 11/20/15

    Japanese Experiment Module (JEM) Airlock Operations for Closeout of Exposed Experiment Handrail Attachment Mechanism (ExHAM) #2: Yui opened the inner JEM Airlock hatch and then, with assistance from Lindgren, removed the Multi-Purpose Experiment Platform (MPEP) from the Small Fine Arm (SFA) Airlock Attachment Mechanism (SAM) on the Slide Table and then removed the SAM from …

    Read Full Post

    ISS Daily Summary Report – 11/19/15

    Columbus A1 Express Rack 3 (ER3) Combustion Event:   This morning at approximately 2:14AM CST, a Potential Fire Alarm associated with Columbus A1 Express Rack 3 (ER3) came into alarm.  The crew sampled the fire port associated with the European Modular Cultivation System (EMCS) since the crew had been working at that location minutes earlier.  Fire …

    Read Full Post

    ISS Daily Summary Report – 11/18/15

    NanoRacks Platform-3 Biorack Installation: Yui installed BioRack Experiment Controllers into NanoRacks Platform-3 today.  NanoRacks Platforms provide a multipurpose research facility on board the ISS that supports NanoRacks Modules installed in EXPRESS (EXpedite the PRocessing of Experiments to Space Station) racks by providing power and data transfer capabilities for investigations in microgravity.   FLame Extinguishment Experiment …

    Read Full Post

    ISS Daily Summary Report – 11/17/15

    Cell Mechanosensing-3:  Yui set up the Multipurpose Small Payload Rack (MSPR) Experiment Laptop Terminal (ELT) in preparation for Cell Mechanosensing-3 operations that will be performed after the arrival of investigation samples on the SpaceX-8 in January, 2016.  He exchanged the laptop hard drive and installed cables between the MSPR Small Experiment Area and the laptop.  …

    Read Full Post

    ISS Daily Summary Report – 11/16/15

    Direct Current Switching Unit (DCSU) 1 Remote Bus Isolator (RBI) 1 Trip Status:  Friday evening and into the weekend, Flight Controllers worked to successfully restore power to the systems normally powered by the 1B channel.  In review of telemetry, the ground team revealed indications that the Sequential Shunt Unit (SSU) 1B may not be able …

    Read Full Post