Pre-determined Debris Avoidance Maneuver (PDAM): On Saturday, the ISS performed a PDAM using 58 Progress R&D thrusters. This was the result of a late notification conjunction. Delta-V was 0.50 meters/second (m/s); burn duration was 4 minutes, 12 seconds. This PDAM will likely replace a reboost that was scheduled for August 6 as the first of three …