Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from March 6th 2015

View All Posts

    ISS Daily Summary Report – 03/06/15

    Airway Monitoring Experiment: The crew prepared the airlock by removing equipment, transferring and setting up Airway Monitoring hardware and configuring a video camera. This experiment was performed in the US airlock at 10.2 psi pressure with the hatch closed. This is the first time the US equipment lock (as a hypobaric facility) was used for …

    Read Full Post