Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from August 15th 2013

View All Posts

    ISS Daily Summary Report – 08/15/13

    New Status: Japanese Experiment Module (JEM) Intermodule Ventilation (IMV) Flow Measurements: Flight Engineer (FE)-3 Cassidy and FE-6 Nyberg vacuumed the surface of the inlet grilles of the overhead and starboard aft inlets and the starboard forward outlet in the JEM. They then set up the Velocicalc instrument to measure and verify sufficient air flow in …

    Read Full Post