New Status: Multi-purpose Small Payload Rack (MSPR) Combustion Chamber (CC) Leak Check: Flight Engineer (FE)-3 Cassidy successfully performed the final portion of the MSPR CC leak check today. He conducted a positive pressure check, which was the third and final required leak check for the Combustion Chamber. Last week he completed the a nitrogen gas supply …