Cell Culture Hardware Test (Space Tango Cell Culture Hardware Test) - 11.29.17

Overview | Description | Applications | Operations | Results | Publications | Imagery

ISS Science for Everyone

Science Objectives for Everyone
Space Tango Cell Culture Hardware Test (Cell Culture Hardware Test) is an engineering test of systems prior to science operations in another hardware unit. This experiment is a preliminary test of Space Tango’s standard Cell Culturing Module. Space Tango Cell Culture Hardware Test provides an evaluation of the Cell Culturing Module inside the TangoLab-1 facility during orbit, and evaluates the microfluidic control while on orbit.
Science Results for Everyone
Information Pending

The following content was provided by , and is maintained in a database by the ISS Program Science Office.
Experiment Details

OpNom:

Principal Investigator(s)

Information Pending

Co-Investigator(s)/Collaborator(s)
Information Pending

Developer(s)
Information Pending

Sponsoring Space Agency
National Aeronautics and Space Administration (NASA)

Sponsoring Organization
National Laboratory (NL)

Research Benefits
Earth Benefits, Scientific Discovery

ISS Expedition Duration
September 2016 - April 2017

Expeditions Assigned
49/50

Previous Missions
Information Pending

^ back to top

Experiment Description

Research Overview
The Space Tango Cell Culture Hardware Test is a checkout test to validate experimental designs, before implementation of actual science operations in a different CubeLab.

Description
Information Pending

^ back to top

Applications

Space Applications
The Space Application for this investigation has yet to be identified.

Earth Applications
Outcomes of this experiment include: 1) maintenance of two different temperatures during launch and ascent; 2) control and maintenance of appropriate culture atmosphere; 3) control of fluidic transportation; 4) containment of both new and used fluids; 5) containment of the culture; 5) culture access to air and fluids; and 6) image capturing. These outcomes will be used to determine customer readiness of the module and future revisions.

^ back to top

Operations

Operational Requirements and Protocols
Information Pending

^ back to top

Decadal Survey Recommendations

Information Pending

^ back to top

Results/More Information

Information Pending

^ back to top

Related Websites

^ back to top


Imagery