The Space Launch System (SLS) core stage pathfinder, which is similar in similar in size, shape and weight to the 212-foot-tall core stage, arrived at NASA’s Michoud Assembly Facility early in the morning on September 27, 2017. To reduce the risk of first-time operations with one-of-a-kind spaceflight hardware for SLS, the agency built a core stage pathfinder. Like SLS, the core stage pathfinder will be doing something that’s never been done — testing new shipping and handling equipment and procedures from the manufacturing site to the test site to the launch site.
Image credit: NASA/MSFC/MAF/Steven Seipel