12-05-2010
December 05, 2010
ISS On-Orbit Status 12/05/10 All ISS systems continue to function nominally, except those noted previously or below.
Sunday – Crew rest day. Ahead: Week 2 of Increment 26. At day’s begin, FE-1 Kaleri conducted the regular daily early-morning check of the aerosol filters at the Russian Elektron O
2 generator which Maxim Suraev had installed on 10/19/09 in gaps between the BZh Liquid Unit and the oxygen outlet pipe (filter FA-K) plus hydrogen outlet pipe (filter FA-V).
[Alex will inspect the filters again before bedtime tonight, currently a daily requirement per plan, with photographs to be taken if the filter packing is discolored.] Later, Kaleri completed the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM (Service Module), including the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow.
[This includes checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers]. FE-1 also performed the weekly checkup on the Russian POTOK-150MK (150 micron) air filter unit of the SM’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for reporting to TsUP.
CDR Kelly configured the WHC (Waste & Hygiene Compartment) for using the internal EDV-U container, and reported the flush counter.
The crew worked out on today’s 2-hr physical exercise protocol on the TVIS treadmill with vibration isolation & stabilization (FE-1, FE-2), ARED advanced resistive exercise device (CDR), T2/COLBERT advanced treadmill (CDR), and VELO bike with bungee cord load trainer (FE-1, FE-2).
[T2 snubber arm inspection is no longer needed after every T2 session but must be done after the last T2 session of the day.] Bone Calcium Loss: Tonight Scott Kelly starts the overnight fast for another dosing with the Bisphosphonates Alendronate pill protocol tomorrow morning.
[Only plain water is allowed for ~10 hrs prior to dosing. The Bisphosphonates study should determine whether antiresorptive agents (that help reduce bone loss) in conjunction with the routine in-flight exercise program will protect ISS crewmembers from the regional decreases in bone mineral density documented on previous ISS missions.] No CEO (Crew Earth Observation) targets uploaded today.
ISS Orbit (as of this morning, 8:09am EST [= epoch])Mean altitude – 350.6 km
Apogee height – 355.7 km
Perigee height – 345.5 km
Period -- 91.55 min.
Inclination (to Equator) -- 51.65 deg
Eccentricity -- 0.0007556
Solar Beta Angle -- -14.4 deg (magnitude decreasing)
Orbits per 24-hr. day -- 15.73
Mean altitude loss in the last 24 hours – 109 m
Revolutions since FGB/Zarya launch (Nov. 98) – 69,042.
Significant Events Ahead (all dates Eastern Time and subject to change):
--------------
Three-crew operations-------------
12/15/10 -- Soyuz TMA-20/25S launch –
Kondratyev (CDR-27)/Coleman/Nespoli (2:09pm)12/17/10 -- Soyuz TMA-20/25S docking (MRM1)
(~3:27pm)--------------
Six-crew operations-------------
12/20/10 -- SPDM (Robotics) Test
01/20/11 -- HTV2 launch
01/21/11 -- Russian EVA-27
01/24/11 -- Progress M-08M/40P undock
01/27/11 -- HTV2 berthing (Node-2 zenith)
01/28/11 -- Progress M-09M/41P launch
01/31/11 -- Progress M-09M/41P docking (DC1)
02/03/10 -- STS-133/Discovery launch
– ~1:34pm --- NET (no earlier than)02/xx/11 -- Russian EVA-28
02/15/11 -- ATV-2 “Johannes Kepler” launch
02/19/11 -- Progress M-07M/39P undock
02/24/11 -- HTV2 unberthing (Node-2 nadir)
02/26/11 -- ATV-2 “Johannes Kepler” docking (SM aft)
03/16/11 -- Soyuz TMA-01M/24S undock/landing
(End of Increment 26)--------------
Three-crew operations-------------
03/20/11 -- Soyuz TMA-21/26S launch –
A. Borisienko (CDR-28)/R.Garan/A.Samokutayev03/22/11 -- Soyuz TMA-21/26S docking (MRM2)
--------------
Six-crew operations-------------
04/01/11 -- STS-134/Endeavour (ULF6 – ELC3, AMS-02) launch –
~3:15pm --- NET04/26/11 -- Progress M-09M/41P undock
04/27/11 -- Progress M-10M/42P launch
04/29/11 -- Progress M-10M/42P docking (DC1)
05/xx/11 -- Russian EVA-29
05/16/11 -- Soyuz TMA-20/25S undock/landing
(End of Increment 27)--------------
Three-crew operations-------------
05/30/11 -- Soyuz TMA-22/27S launch –
M. Fossum (CDR-29)/S. Furukawa/S. Volkov06/01/11 -- Soyuz TMA-22/27S docking (MRM1)
--------------
Six-crew operations-------------
06/04/11 -- ATV-2 “Johannes Kepler” undock (SM aft)
06/21/11 -- Progress M-11M/43P launch
06/23/11 -- Progress M-11M/43P docking (SM aft)
08/29/11 -- Progress M-11M/43P undocking
08/30/11 -- Progress M-12M/44P launch
09/01/11 -- Progress M-12M/44P docking (SM aft)
09/16/11 – Soyuz TMA-21/26S undock/landing
(End of Increment 28)--------------
Three-crew operations-------------
09/30/11 -- Soyuz TMA-23/28S launch –
D.Burbank (CDR-30)/A.Shkaplerov/A.Ivanishin 10/02/11 – Soyuz TMA-23/28S docking (MRM2)
--------------
Six-crew operations-------------
10/25/11 -- Progress M-10M/42P undocking
10/26/11 -- Progress M-13M/45P launch
10/28/11 -- Progress M-13M/45P docking (DC-1)
11/16/11 -- Soyuz TMA-22/27S undock/landing
(End of Increment 29)--------------
Three-crew operations-------------
11/30/11 -- Soyuz TMA-24/29S launch –
O.Kononenko (CDR-31)/A.Kuipers/D.Pettit12/02/11 -- Soyuz TMA-24/29S docking (MRM1)
--------------
Six-crew operations----------------
12/??/11 -- 3R Multipurpose Laboratory Module (MLM) w/ERA – on Proton.
12/26/11 -- Progress M-13M/45P undock
12/27/11 -- Progress M-14M/46P launch
12/29/11 -- Progress M-14M/46P docking (DC-1)
03/05/12 -- Progress M-12M/44P undock
03/16/12 -- Soyuz TMA-23/28S undock/landing
(End of Increment 30)--------------
Three-crew operations-------------
03/30/12 -- Soyuz TMA-25/30S launch –
G.Padalka (CDR-32)/J.Acaba/K.Valkov04/01/12 -- Soyuz TMA-25/30S docking (MRM2)
--------------
Six-crew operations----------------
05/15/12 -- Soyuz TMA-24/29S undock/landing
(End of Increment 31)--------------
Three-crew operations-------------
05/29/12 – Soyuz TMA-26/31S launch –
S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide 05/31/12 – Soyuz TMA-26/31S docking
--------------
Six-crew operations----------------
09/09/12 -- Soyuz TMA-25/30S undock/landing
(End of Increment 32)--------------
Three-crew operations-------------
09/23/12 -- Soyuz TMA-27/32S launch –
K.Ford (CDR-34)/O. Novitskiy/E.Tarelkin09/25/12 – Soyuz TMA-27/32S docking
--------------
Six-crew operations-------------
10/07/12 -- Soyuz TMA-26/31S undock/landing
(End of Increment 33)--------------
Three-crew operations-------------
11/xx/12 -- Soyuz TMA-28/33S launch –
C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko11/xx/12 – Soyuz TMA-28/33S docking
--------------
Six-crew operations-------------
03/xx/12 -- Soyuz TMA-27/32S undock/landing
(End of Increment 34)--------------
Three-crew operations-------------
03/xx/12 – Soyuz TMA-29/34S launch.
03/xx/12 – Soyuz TMA-29/34S docking
--------------
Six-crew operations-------------
To send holiday greetings to the crew and get more information about the space station, visit
http://www.nasa.gov/station.