11-27-2010
November 27, 2010
ISS On-Orbit Status 11/27/10 All ISS systems continue to function nominally, except those noted previously or below.
Saturday --- Crew rest day. - Crew wake/sleep cycle is back to normal: Wake – 1:00am, Sleep – 4:30pm EST.
At day’s begin, FE-2 Skripochka conducted the regular daily early-morning check of the aerosol filters at the Russian Elektron O
2 generator which Maxim Suraev had installed on 10/19/09 in gaps between the BZh Liquid Unit and the oxygen outlet pipe (filter FA-K) plus hydrogen outlet pipe (filter FA-V).
[Oleg will again inspect the filters before bedtime tonight, currently a daily requirement per plan, with photographs to be taken if the filter packing is discolored.] CDR Kelly continued his current week-long activity with the post-wakeup experiment SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight), Scott’s 3
rd, transferring data from their Actiwatches to the HRF-1 (Human Research Facility 1) laptop.
[To monitor their sleep/wake patterns and light exposure during a SLEEP session, US crewmembers wear a special Actiwatch device which measures the light levels encountered by him/her as well as their patterns of sleep and activity throughout the Expedition, using the payload software for data logging and filling in questionnaire entries in the experiment’s laptop session file on the HRF-1 laptop. The log entries are done within 15 minutes of final awakening for seven consecutive days.] Kelly, Skripochka & Kaleri completed the regular weekly three-hour task of thorough cleaning of their home, including COL (Columbus Orbital Laboratory) and Kibo JPM (JEM Pressurized Module).
["Uborka", usually done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the SM (Service Module) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the sleep stations with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.] As part of the uborka house cleaning, Alex & Oleg conducted regular maintenance inspection & cleaning of fan screens in the FGB (TsV2) plus the BMP Harmful Contaminants Removal System grille and Group E fan grilles (VPkhO, FS5, FS6, VP) in the SM (Service Module).
At ~8:35am EST, the crew conducted their regular WPC (Weekly Planning Conference) with the ground, discussing next week's "Look-Ahead Plan" (prepared jointly by MCC-H and TsUP-Moscow timeline planners), via S-band/audio, reviewing upcoming activities and any concerns about future on-orbit events.
In the new Soyuz TMA-01M/24S (#701) spacecraft, docked at the MRM2 “Poisk” at FGB nadir, Alex deactivated the GA gas analyzer in the SA/Descent Module which he had activated on 10/22 for a periodic atmosphere checkup.
Oleg meanwhile performed routine maintenance on the SM SRVK-2M system by replacing its BKO multifiltration unit with a spare, discarding the old unit and updating the IMS (Inventory Management System). (Last time done: 9/15).
[BKO contains five purification columns to rid the condensate of dissolved mineral and organic impurities. It has a service lifetime of ~450 liters throughput. The water needs to be purified for proper electrolysis in the Elektron O2 generator.] Kelly configured the WHC (Waste & Hygiene Compartment) for using the internal EDV-U container, and reported the flush counter.
Afterwards, Scott completed the regular bi-monthly reboots of the OCA Router & FS SSC (File Server Station Support Computer) laptops (the latter required to mitigate the problem of iPV and OSTPV not opening up procedures due to a memory leak in the “Tomcat” software). After a period of no less than 10 min later, the CDR also rebooted the two ISS network servers (SERVER1 & 2).
The crew worked out on today’s 2-hr physical exercise protocol on the TVIS treadmill with vibration isolation & stabilization (FE-1, FE-2), ARED advanced resistive exercise device (CDR, FE-2), T2/COLBERT advanced treadmill (CDR), and VELO bike with bungee cord load trainer (FE-1).
[T2 snubber arm inspection is no longer needed after every T2 session but must be done after the last T2 session of the day.] Correction: Flight Engineer Fyodor Yurchikhin returned to Star City on a Tupolev Tu-134 plane, now being used by the GCTC (Gagarin Cosmonaut Training Center) instead of the TU-154 used earlier and reported here yesterday erroneously.
Weekly Science Update (Expedition Twenty-Five -- Week 9).
2D NANO Template (JAXA): No report.
3D SPACE: No report.
AgCam (Agricultural Camera): No report.
ALTCRISS (Alteino Long Term monitoring of Cosmic Rays on the ISS): Complete.
ALTEA SHIELD (NASA/ASI): 5 out of 6 SDU's continue to acquire science data.
APEX (Advanced Plant Experiments on Orbit) -Cambium: No report.
APEX-TAGES (Transgenic Arabidopsis Gene Expression System): No report.
BCAT-4/5 (Binary Colloidal Alloy Test 4/5): The attached figure (
not reproduced here) shows the results of the preliminary analysis of sample 8 second run. It shows the growth of the phase separating regions against time in two areas of Sample 8. As seen previously in Samples 6 and 7, the domains grow linearly with time at the beginning of the run, but growth becomes arrested about 24 hours after the initialization of the run. This graph shows two sets of data, taken by performing the correlation function on two regions of sample 8, showing that there is some variation due to lighting conditions etc, but overall agreement between the two sets is reassuring. Once again, special thanks to Shannon Walker for making this last run of BCAT-5 sample 8 a complete success. “As this is the end of the last scheduled run of our BCAT-5 samples, we would like to take this opportunity to thank everybody who has been involved. We appreciate the dedication and hard work of team members on the ISS, at NASA and at CSA that has been so crucial in making these experiments a success.”
BIOLAB (ESA): No report.
BIORHYTHMS (JAXA, Biological Rhythms): No report.
BISE (CSA, Bodies in the Space Environment): No report.
BISPHOSPHONATES: No report.
CARD (Long Term Microgravity: Model for Investigating Mechanisms of Heart Disease, ESA): No report.
CARDIOCOG-2: Complete.
CB (JAXA Clean Bench): No report.
CBEF (JAXA Cell Biology Experiment Facility)/SPACE SEED: No report.
CCISS (Cardiovascular & Cerebrovascular Control on Return from ISS): No report.
CERISE (JAXA): No report.
CFE-2 (Capillary Flow Experiment 2): No report.
CFS-A (Fungi-A): Awaiting ULF5 launch.
CSI-3/CGBA-5 (CGBA Science Insert #2/Commercial Generic Bioprocessing Apparatus 5): Ongoing.
CGBA-2 (Commercial Generic Bioprocessing Apparatus 2): Complete.
CIR (Combustion Integrated Rack), MDCA/Flex: On 11/18, three test points were successfully performed with four counting towards the science matrix (one test point was skipped). The test points were performed with heptane fuel at a 1 atm chamber environment of 20% O2, 5% CO2, and 75% N2. None of the test points used the support fiber. • Test #1 - Droplet diameter of 3.5 - 4 mm. Good clean droplet. Good deployment with slow drift. The flame was luminous initially, grew, became dim blue and began to shrink. It burned for a relatively long time (~15 sec) before a disruption coincident with flame extinction. • Test #2 - Droplet diameter of 2.5 - 3 mm. Droplet and needles look clean. Good deployment and ignition. The total burn time was 8 - 10 sec. The flame was luminous yellow, then became dim blue with some visible soot between the flame and droplet. The flame decreased in size until a disruption coincident with flame extinction. • Test #3 - Droplet diameter of 4 mm. Attempted a larger droplet to observe radiative extinction. Droplet looked clean. Good deployment with slight drift. The flame was large and dim blue and burned for 7 - 8 sec. The flame oscillated 1-2 cycles before extinction (presumably radiative extinction). A vapor cloud formed ~15 - 18 sec after visible flame extinction. Could not see whether there was rapid vaporization after visible flame extinction. We were able to successfully observe radiative extinction and pre-extinction flame instabilities with these tests. Because Test #1 and Test #3 were relatively close in size and one burned to near completion and one radiatively extinguished (with a relatively long burn time), we should have a relatively good definition of the radiative extinction boundary for this ambient condition. We were unable to observe diffusive extinction (if it exists in this ambient/fuel combination) because of the disruption at the end of the test. .
Commercial Photo (JAXA): No report.
CSLM-2 (Coarsening in Solid-Liquid Mixtures 2): No report.
CubeLab: No report.
CW/CR (Cell Wall/Resist Wall) in EMCS (European Modular Cultivation System): Complete.
DECLIC (Device for the Study of Critical Liquids & Crystallization, CNES/NASA): As planned, the Declic DSI-C sequence started on 11/22. The scientific objective of the DSI-C run is to measure the influence of the macroscopic curvature front solidification on the microstructure formation dynamics. During this week, we performed 2 solidifications at speeds of 2 and 1 micron / sec. We captured 7000 images during these solidifactions.
DomeGene (JAXA): Complete.
DOSIS (Dose Distribution Inside ISS, ESA): Acquiring science data with DOSTEL-2 detector.
EarthKAM (Earth Knowledge Acquired by Middle School Students): No report.
EDR (European Drawer Rack, ESA): No report.
ELITE-S2 (Elaboratore Immagini Televisive - Space 2): Planned.
EMCS (European Modular Cultivation System): No report.
ENose (Electronic Nose): No report.
EPM (European Physiology Module): Activated in support of CARD.
EPO (Educational Payload Operations, NASA) (Hobbies): No report.
EPO (Educational Payload Operations, NASA) (Kids in Space): No report.
EPO LES-2 (ESA): No report.
EPO COMMERCIAL (JAXA): No report.
.
EPO 3-min Video (JAXA): No report.
EPO J-Astro Report (JAXA): No report.
EPO Dewey’s Forest (JAXA): Closed out on 3/15.
EPO Space Clothes (JAXA): Complete.
EPO Hiten (Dance, JAXA): No report.
EPO-5 SpaceBottle (Message in a Bottle, JAXA): Space Bottle has been wrapped with Kapton tape and moved to the airlock for ULF5 EVA on 10/14. This bottle will be exposed in space by ULF-5 shuttle EVA.
EPO Moon Score (JAXA): No report.
EPO Try Zero-G (JAXA): No report.
EPO Kibo Kids Tour (JAXA): Complete.
EPO Paper Craft (Origami, JAXA): No report.
EPO Poem (JAXA): No report.
EPO Spiral Top (JAXA): No report.
ERB-2 (Erasmus Recording Binocular, ESA): [ERB-2 aims are to develop narrated video material for various PR & educational products & events, including a 3D interior station view.] No report.
ETD (Eye Tracking Device): Completed.
FACET-2 (JAXA): No report.
FERULATE (JAXA): No report.
FIR/LMM/CVB (Fluids Integrated Rack / Light Microscopy Module / Constrained Vapor Bubble): No report.
Fish Scales (JAXA): Completed on FD7/ULF-4 and returned on STS-132.
FOAM STABILITY (ESA): No report.
FOCUS: No report.
FSL (Fluid Science Laboratory, ESA): No report.
FWED (Flywheel Exercise Device, ESA): No report.
GENARA-A (Gravity Regulated Genes in Arabidopsis A/ESA): No report.
GEOFLOW: No report.
HAIR (JAXA): Hair sampling sessions for Walker and Wheelock were completed on 11/12.
HDTV System (JAXA): Was delivered by HTV1.
Holter ECG (JAXA): No report.
HQPC (JAXA): Was delivered by 34P.
HREP (HICO/Hyperspectral Imager for the Coastal Ocean & RAIDS/Remote Atmospheric & Ionospheric Detection System/JAXA): HREP is operating nominally and 2103 images have been taken to date. The most recent HICO images taken include the coast of North Carolina, Monterey Bay in California, the Santa Barbara Channel, and the lower Chesapeake Bay.
HydroTropi (Hydrotropism & Auxin-Inducible Gene Expression in Roots Grown under Microgravity Conditions/JAXA): No report.
ICE CRYSTAL (JAXA): Complete.
ICV (Integrated Cardiovascular): No report.
IMMUNO (Neuroendocrine & Immune Responses in Humans During & After Long Term Stay at ISS): Complete.
INTEGRATED IMMUNE: No report.
InSPACE-2 (Investigating the Structure of Paramagnetic Aggregates from Colloidal Emulsions 2): No report.
IRIS (Image Reversal in Space, CSA): No report.
ISS Amateur/Ham Radio: No report.
IV Gen (Intravenous Fluids Generation): No report.
KID/KUBIK6: No report.
Kids in Micro-G: No report.
KUBIK 3 (ESA): No report.
LOCAD-PTS (Lab-on-a-Chip Application Development-Portable Test System): No report.
Matryoshka-2 (RSA): No report.
Marangoni Exp (JAXA): 15th run of the experiment was completed on 11/23-11/24.
Marangoni DSD – Dynamic Surf (JAXA): Payload name was change from Marangoni DSD to Dynamic Surf.
MAXI (Monitor of All-sky X-ray Image, JAXA): Continuous operation from Inc19&20.
MDCA/Flex: See under CIR.
MEIS (Marangoni Experiment for ISS) in JAXA FPEF (Fluid Physics Experiment Facility): No report.
Microbe-2 (JAXA): No report.
Micro-G Clay (JAXA EPO): Complete.
MMA (JAXA/Microgravity Measurement Apparatus): No report.
MISSE-7 (Materials ISS Experiment): MISSE-7 is operating nominally and all Science data continues to be downlinked.
MPAC/SEED (JAXA): Completed on 19A FD4.
MSG-SAME (Microgravity Science Glovebox-Smoke Aerosol Measurement Experiment): No report.
MSL (Materials Science Laboratory, ESA): No report.
MTR-2 (Russian radiation measurements): Passive dosimeters measurements in DC-1 “Pirs”.
MULTIGEN-1: Completed.
MYCO 3 (JAXA): Sampling sessions for Walker and Wheelock were performed on 11/23-24.
MyoLab (JAXA): Completed on 4/20.
NANOSKELETON (Production of High Performance Nanomaterials in Microgravity, JAXA): Returned on 19A.
NEURORAD (JAXA): No report.
NEUROSPAT (ESA/Study of Spatial Cognition, Novelty Processing and Sensorimotor Integration): No report.
NOA-1/-2 (Nitric Oxide Analyzer, ESA): Complete.
NUTRITION w/REPOSITORY/ProK: “Scott, great job with meeting the constraints of the Nutrition experiment. Your next session is your FD120 session.”
PADIAC (Pathway Different Activators, ESA): The PADIAC samples were transferred to the Soyuz for return.
PADLES (JAXA, Area PADLES 3/4; Passive Area Dosimeter for Lifescience Experiment in Space): No report.
PASSAGES (JAXA): No report.
PCDF-PU (Protein Crystallization Diagnostic Facility - Process Unit): No report.
PCG (JAXA, Protein Crystal Growth): PCG removal from Ryutai Rack was completed on 11/25. The sample returned home on 23S Soyuz.
PCRF (Protein Crystallization Research Facility) Reconfiguration (JAXA): See PCG. PMDIS (Perceptual Motor Deficits in Space): Complete.
POLCA/GRAVIGEN (ESA): Complete.
Pro K: No report.
RadGene & LOH (JAXA): Complete.
RadSilk (JAXA): Samples were returned to ground on ULF3.
RST/Reaction Self Test (Psychomotor Vigilance Self Test on the ISS): "Wheels, Shannon and Scott: thank you for your continued participation in Reaction Self Test! Scott, on 11/29 there is an activity to recover data from past increments. These data along with the data from you, Wheels and Shannon over the last month, will be downlinked on 11/29. We appreciate your help with this activity and look forward to receiving and reviewing your data!"
RYUTAI Rack (JAXA): No report.
SAIBO Rack (JAXA): No report.
SAMS/MAMS (Space & Microgravity Acceleration Measurement Systems): No report.
SAMPLE: Complete.
SCOF (Solution Crystallization Observation Facility, JAXA): No report.
SEDA-AP (Space Environment Data Acquisition Equipment-Attached Payload, JAXA): Continuous operation from Inc 19&20.
SHERE (Shear History Extensional Rheology Experiment): Complete.
SLAMMD (Space Linear Acceleration Mass Measurement Device): No report.
SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight): "Scott: Thank you for performing another week of Sleep logging. Your next session of log-entries will begin on December 13th."
SMILES (JAXA): 10th recooling warm-up process is on-going (it is in warming process now).
SODI/IVIDIL (Selectable Optical Diagnostics Instrument/Influence of Vibration on Diffusion in Liquids, ESA): No report.
SODI/COLLOID (Selectable Optical Diagnostics Instrument/Colloid): No report.
SOLAR (Solar Monitoring Observatory): Sun observation window #34 has started on 10/29 and ended on 11/09.
SOLO (Sodium Loading in Microgravity): No report.
Space-DRUMS (Space Dynamically Responding Ultrasonic Matrix System): No report.
SPHERES (Synchronized Position Hold, Engage, Reorient, Experimental Satellite): No report.
SPHINX (SPaceflight of Huvec: an Integrated eXperiment, ESA): “Scott, thanks for de-installing the SPHINX samples from EDR-KUBIK, the samples are on their way home with 23S.”
SPICE (Smoke Point In Co-flow Experiment): No report.
SPINAL (Spinal Elongation): No report.
SWAB (Characterization of Microorganisms & Allergens in Spacecraft): No report.
TASTE IN SPACE (ESA): No report.
THERMOLAB (ESA): No report.
TRAC (Test of Reaction & Adaptation Capabilities): Planned.
TRIPLELUX-B (ESA): No report.
ULTRASOUND: Planned.
VASCULAR (CSA): No report.
VCAM (Vehicle Cabin Atmosphere Module, NASA): No report.
VESSEL ID System (ESA): Acquiring science nominally.
VESSEL IMAGING (ESA): No report.
VO2max (NASA): No report.
VLE (Video Lessons ESA): No report.
WAICO #1/#2 (Waving and Coiling of Arabidopsis Roots at Different g-levels; ESA): No report.
YEAST B (ESA): No report.
CEO (Crew Earth Observation): No report.
No CEO (Crew Earth Observation) targets uploaded today.
ISS Orbit (as of this morning, 8:53am EST [= epoch]) Mean altitude – 351.5 km
Apogee height – 356.6 km
Perigee height – 346.4 km
Period -- 91.57 min.
Inclination (to Equator) -- 51.67 deg
Eccentricity -- 0.0007602
Solar Beta Angle -- -51.9 deg (magnitude decreasing)
Orbits per 24-hr. day -- 15.72
Mean altitude loss in the last 24 hours – 146 m
Revolutions since FGB/Zarya launch (Nov. 98) – 68,917.
Significant Events Ahead (all dates Eastern Time and subject to change):
--------------
Three-crew operations-------------
12/15/10 -- Soyuz TMA-20/25S launch –
Kondratyev (CDR-27)/Coleman/Nespoli (2:09pm) 12/17/10 -- Soyuz TMA-20/25S docking (MRM1)
(~3:09pm) --------------
Six-crew operations-------------
12/17/10 -- STS-133/Discovery launch
– NET (not earlier than) 01/20/11 -- HTV2 launch
01/24/11 -- Progress M-08M/40P undock
01/27/11 -- HTV2 berthing (Node-2 nadir)
01/28/11 -- Progress M-09M/41P launch
01/31/11 -- Progress M-09M/41P docking (DC1)
02/xx/11 -- Russian EVA-28
02/15/11 -- ATV-2 “Johannes Kepler” launch
02/19/11 -- Progress M-07M/39P undock
02/24/11 -- HTV2 unberthing (Node-2 nadir)
02/26/11 -- ATV-2 “Johannes Kepler” docking (SM aft)
02/27/11 -- STS-134/Endeavour (ULF6 – ELC3, AMS-02) launch
03/01/11 -- STS-134/Endeavour (ULF6 – ELC3, AMS-02) docking
03/11/11 -- STS-134/Endeavour (ULF6 – ELC3, AMS-02) undock
03/16/11 -- Soyuz TMA-01M/24S undock/landing
(End of Increment 26) --------------
Three-crew operations-------------
03/20/11 -- Soyuz TMA-21/26S launch –
A. Borisienko (CDR-28)/R.Garan/A.Samokutayev 03/22/11 -- Soyuz TMA-21/26S docking (MRM2)
--------------
Six-crew operations-------------
04/26/11 -- Progress M-09M/41P undock
04/27/11 -- Progress M-10M/42P launch
04/29/11 -- Progress M-10M/42P docking (DC1)
05/xx/11 -- Russian EVA-29
05/16/11 -- Soyuz TMA-20/25S undock/landing
(End of Increment 27) --------------
Three-crew operations-------------
05/30/11 -- Soyuz TMA-22/27S launch –
M. Fossum (CDR-29)/S. Furukawa/S. Volkov 06/01/11 -- Soyuz TMA-22/27S docking (MRM1)
--------------
Six-crew operations-------------
06/04/11 -- ATV-2 “Johannes Kepler” undock (SM aft)
06/21/11 -- Progress M-11M/43P launch
06/23/11 -- Progress M-11M/43P docking (SM aft)
08/29/11 -- Progress M-11M/43P undocking
08/30/11 -- Progress M-12M/44P launch
09/01/11 -- Progress M-12M/44P docking (SM aft)
09/16/11 – Soyuz TMA-21/26S undock/landing
(End of Increment 28)
--------------
Three-crew operations-------------
09/30/11 -- Soyuz TMA-23/28S launch –
D.Burbank (CDR-30)/A.Shkaplerov/A.Ivanishin 10/02/11 – Soyuz TMA-23/28S docking (MRM2)
--------------
Six-crew operations-------------
10/25/11 -- Progress M-10M/42P undocking
10/26/11 -- Progress M-13M/45P launch
10/28/11 -- Progress M-13M/45P docking (DC-1)
11/16/11 -- Soyuz TMA-22/27S undock/landing
(End of Increment 29) --------------
Three-crew operations-------------
11/30/11 -- Soyuz TMA-24/29S launch –
O.Kononenko (CDR-31)/A.Kuipers/D.Pettit 12/02/11 -- Soyuz TMA-24/29S docking (MRM1)
--------------
Six-crew operations----------------
12/??/11 -- 3R Multipurpose Laboratory Module (MLM) w/ERA – on Proton.
12/26/11 -- Progress M-13M/45P undock
12/27/11 -- Progress M-14M/46P launch
12/29/11 -- Progress M-14M/46P docking (DC-1)
03/05/12 -- Progress M-12M/44P undock
03/16/12 -- Soyuz TMA-23/28S undock/landing
(End of Increment 30) --------------
Three-crew operations-------------
03/30/12 -- Soyuz TMA-25/30S launch –
G.Padalka (CDR-32)/J.Acaba/K.Valkov 04/01/12 -- Soyuz TMA-25/30S docking (MRM2)
--------------
Six-crew operations----------------
05/15/12 -- Soyuz TMA-24/29S undock/landing
(End of Increment 31) --------------
Three-crew operations-------------
05/29/12 – Soyuz TMA-26/31S launch –
S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide 05/31/12 – Soyuz TMA-26/31S docking
--------------
Six-crew operations----------------
09/09/12 -- Soyuz TMA-25/30S undock/landing
(End of Increment 32) --------------
Three-crew operations-------------
09/23/12 -- Soyuz TMA-27/32S launch –
K.Ford (CDR-34)/O. Novitskiy/E.Tarelkin 09/25/12 – Soyuz TMA-27/32S docking
--------------
Six-crew operations-------------
10/07/12 -- Soyuz TMA-26/31S undock/landing
(End of Increment 33) --------------
Three-crew operations-------------
11/xx/12 -- Soyuz TMA-28/33S launch –
C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko 11/xx/12 – Soyuz TMA-28/33S docking
--------------
Six-crew operations-------------
03/xx/12 -- Soyuz TMA-27/32S undock/landing
(End of Increment 34) --------------
Three-crew operations-------------
03/xx/12 – Soyuz TMA-29/34S launch.
03/xx/12 – Soyuz TMA-29/34S docking
--------------
Six-crew operations-------------
To send holiday greetings to the crew and get more information about the space station, visit
http://www.nasa.gov/station.