LOADING...
Inspecting the 14 x 22 Wind Tunnel
Inspecting the 14 x 22 Wind Tunnel

Frank Quinto, facility manager for the 14- by 22 Foot Subsonic Tunnel, inspects the fan blade area of the tunnel. Technicians erected scaffolding (in the background) to remove the blades for minor repairs.

The fan blades will be re-installed so the tunnel can be up and running again by the end of the month.

Credit: NASA/Sean Smith

Page Last Updated: August 21st, 2013
Page Editor: NASA Administrator