Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from January 20th 2020

View All Posts

    ISS Daily Summary Report – 1/20/2020

    HERMES:  The crew performed the periodic vacuum valve opening for HERMES.  These operations maintain the desired vacuum levels for the granular/regolith experiments typically hosted by the HERMES facility.  Hermes is a reconfigurable on-orbit facility capable of accommodating up to four user-configurable experiment volumes at a time. The facility provides long duration exposure to microgravity, vacuum …

    Read Full Post