Due to the lapse in federal government funding, NASA is not updating this website.

Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from April 9th 2019

View All Posts

    ISS Daily Summary Report – 4/09/2019

    Combustion Integration Rack (CIR)/Advanced Combustion via Microgravity Experiments (ACME) Hardware Replacement:  The crew changed the CIR/ACME system from the BRE (Burning Rate Emulator) experiment configuration to the Flame Design experiment configuration. The Flame Design investigation studies the production and control of soot to optimize oxygen-enriched combustion and the design of robust, soot-free flames. Soot can …

    Read Full Post