Lab Carbon Dioxide Removal Assembly (CDRA) Maintenance: Yesterday the crew removed Lab CDRA from the rack, and disassemble it by removing all of the valves and ducting to access the beds. They also removed the old beds. Today, the crew installed the newer generation beds, like those in Node 3 CDRA, mated Hydraflow Couplings, and …
ISS Daily Summary Report – 3/01/2017
Read Full Post