Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from June 29th 2016

View All Posts

    ISS Daily Summary Report – 06/29/16

    Exposed Experiment Handrail Attachment Mechanism (ExHAM) #1-2 Operations: Following the JEMAL depressurization, venting, and leak check yesterday, today ExHAM was installed on the JEMAL Slide Table and extended to the JEM Exposed Facility (JEF) side. ExHAM is a cuboid mechanism equipped with a grapple fixture on the upper surface for the Kibo’s robotic arm, Japanese …

    Read Full Post