Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from February 4th 2016

View All Posts

    ISS Daily Summary Report – 02/4/16

    Node 3 Carbon Dioxide Removal Assembly (CDRA) Repair:  Kelly and Kopra replaced the Fan Motor Controller (FMC) on the Node 3 CDRA which had failed on January 19th.  In addition to the FMC change out, the crew took advantage of the CDRA configuration and also replaced a faulty Secondary Heater Controller, an Air Selector Valve …

    Read Full Post