Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from March 17th 2015

View All Posts

    ISS Daily Summary Report – 03/17/15

    Node 3 Carbon Dioxide Removal Assembly (CDRA):  Overnight the Flight Control Specialist’s attempt to repower Node 3 CDRA failed due to both CDRA bed heaters reporting as failed.  The ppCO2 levels remain low and preliminary assessment level will remain below limits with no CDRA for a couple days.  The team has been able to override …

    Read Full Post