Text Size

NASA's Current Categorical Exclusions
 
To view a Categorical Exclusion document, either click the title of the item or the specific documentation section.
REC Date Description Cat-Ex Number Center Documentation
5/3/2007March 2007 RFF's and Operational Directives1-iMAF Cat Ex, Checklist
9/23/2009ARRA Implementation of Venture-Class Mission, HQ ID -10951-iiiHQREC, Cat Ex, Checklist
1/5/2010Purchase of a Global Hawk Mobile Operation Facility (GHMOF) with ARRA funds1-iiiDFRCREC, Cat Ex, Checklist
3/12/2009Advanced Information Systems Technology (AIST). JPL 87-136561-ivJPLREC, Cat Ex
3/23/2010Contrail Study Document1-v LaRCREC, Cat Ex
2/4/2002KSC Environmental & Energy Awareness Preparation1-viKSCREC, Cat Ex
11/20/2009 and 11/18/09Develop Data Acquisition System to be added to EARL1-viiLaRCREC, Cat Ex
7/5/2007Addition to Building 4838, Data Analysis Facility (DAF)2-iDFRCCat Ex
11/3/2009Starfighters Fuel Tank. Directorate Project Number: KCA-42442-iKSCREC, Cat Ex, Checklist
2/25/2009New or Remodeled LaRC Fire Station2-iLaRCChecklist
12/7/2009Depot Level Maintenance and Life Extension Major Antenna Upgrade and Modification2-iJPLREC, Cat Ex, Checklist
3/15/2006Array Prototype: Construct and Operate a Series of Antenna Arrays on 25 Acres. Project 05Cof242-iJPLREC, Cat Ex, Checklist
3/12/20097841 Repair Crawlerway Rock Replacement Project # 98760 (Rev.B)2-iKSCREC, Cat Ex
2/23/2010Child Day Care Drainage Improvements. Modified canopy gutter system and installed two concrete channels2-iSSCREC, Cat Ex
7/17/2007Close/Demolish Facilities Structures, Direct Project 97963.4 Rev 42-iKSCREC, Cat Ex
9/4/2002FY05 CoF Projects - Replace Roofs 101/1022-iMSFCREC, Cat Ex, Checklist
7/19/2010Internal Modification to the North Gate Reception Center Restroom 2-iSSCREC, Cat Ex
3/18/2009Repair JSC Barge Dock2-iJSCREC, Cat Ex, Checklist
3/18/2009Replace Hangar 280 at EF near Washrack Facility. Project # 090122-iJSCREC, Cat Ex, Checklist
8/18/2008Replace Potable Water Well System. Prelim Env. Study Control # 08/0972-iSSCREC, Cat Ex
4/18/2008USM Oceanographic Support Facilities, Preliminary Environmental Study Control Number 08-0572-iJCSREC, Cat Ex
10/8/2009Wind Tunnel Project (a. Enhance Rotor Test Cell Control Room Equipment and Instrumentation)2-iLaRCREC, Cat Ex
10/20/2008Grade Existing Mauna Kea 4WD Road into a Test Site for the SCARAB Robot2-iJSCREC, Cat Ex tiered off Constellation Programmatic EIS
9/4/2002CoF Project Replace Roofing System (103)- Phase II Records of Environmental Consideration, Environmental Evaluation Checklists, and Synopsis of CoF Project2-iMSFCREC, Cat Ex, Checklist
7/30/2010Demolish Buildings 108, 175 (Partial), 205, 352 (Partial), and 4062-iMAF REC, Cat Ex
2/23/2007Provide Comprehensive FTS and Communication Support2-iDFRCREC, Cat Ex
6/7/2007Construct New Consolidated Information Technology Center2-iDFRCREC, Cat Ex, Checklist
2/23/2007Installation of Flight Termination System (FTS) Equipment at Aeronautical Tracking Facility (ATF) 22-iDFRCREC, Cat Ex, Checklist
4/17/1999Installation of Telecommunication Coduit Lower Boresite Building 48872-iDFRCREC, Cat Ex, Checklist
1/4/2000Installation of Telecommunication Conduit to Building 48442-iDFRCREC, Cat Ex, Checklist
3/18/2009Repair Miscellaneous Facilities and Structures Phase II (Stimilus Package)2-iJSCREC, Cat Ex, Checklist
3/18/2009Roof Replacement and Repair Projects Phase IIA (Stimulus Package)2-iJSCREC, Cat Ex, Checklist
3/18/2009Roof Replacement and Repair Projects Phase IIB (Stimulus Package)2-iJSCREC, Cat Ex, Checklist
9/4/2002Building 110 Chilled Water System Project2-iMSFCREC, Cat Ex, Checklist
7/7/2010E-Green Airship Siting at KSC Roberts Road and Ave A2-iKSCREC, Cat Ex, Checklist
1/26/2010Recovery Act Upgrades to Launch Complex 40, CCAFS-KSC Launch Infrastructure Updates2-iKSCREC, Cat Ex, Checklist
8/16/2007Access Platform Over E-3, Cell 2 Run Tanks2-iSSCREC, Cat Ex
4/11/2000Ditch Cleaning Demonstration2-iKSCREC, Cat Ex
8/15/2007Emergency Lighting Phase II2-iSSCREC, Cat Ex
8/16/2007Fabricate and Install at Beam at HPIW2-iSSCREC, Cat Ex
10/8/2009Wind Tunnel Project (b. Install Acoustic Phased Array with Test Section2-iiLaRCREC, Cat Ex
10/8/2009Wind Tunnel Project (c. Add Jet Engine Simulator for Testing2-iiLaRCREC, Cat Ex
2/9/2009Multiangle Spectropolarimetric Aerosol Characterization and Target Detection Through Haze. JPL 81-132772-iiJPLREC, Cat Ex
3/19/2010Removal of Emergency Generator/Fuel Tank from Building 1100. Prelim Env. Study Control # 10-0412-iiSSCREC, Cat Ex
11/3/2009Starfighters Fuel Tank. Directorate Project Number: KCA-42442-iiKSCREC, Cat Ex, Checklist
9/4/2002CoF Project Replace Cell E Air Handling Units #1 & #2 (110)- Records of Environmental Consideration, Environmental Evaluation Checklists, and Synopsis of CoF Project2-iiMSFCREC, Cat Ex, Checklist
9/4/2002CoF Project Replace Site Wide High Voltage Oil Switches- Records of Environmental Consideration, Environmental Evaluation Checklists, and Synopsis of CoF Project2-iiMSFCREC, Cat Ex, Checklist
2/23/2007Installation of Flight Termination System (FTS) Equipment at Aeronautical Tracking Facility (ATF) 22-iiDFRCREC, Cat Ex, Checklist
4/17/1999Installation of Telecommunication Coduit Lower Boresite Building 48872-iiDFRCREC, Cat Ex, Checklist
1/4/2000Installation of Telecommunication Conduit to Building 48442-iiDFRCREC, Cat Ex, Checklist
6/8/2009Construct Photovoltaic Array2-iiKSCREC, Cat Ex, Checklist
7/7/2010E-Green Airship Siting at KSC Roberts Road and Ave A2-iiKSCREC, Cat Ex, Checklist
12/17/2008Hypergolic Propellent Destruction Evaluation2-iiKSCREC, CatEx, Checklist
9/14/2010Temporary SpaceX Antenna at J6-553A2-iiKSCREC, Cat Ex, Checklist
8/15/2007Emergency Lighting Phase II2-iiSSCREC, Cat Ex
2/16/2007Gantry Crane Removal 400 Area2-ii WSTFREC, Cat Ex
5/5/10 and 4/30/10Integrated Intelligent Flight Deck2-ii LaRCREC, Cat Ex
4/9/2009 Global Differential GPS Technology Transfer Data Exchange, and Support. JPL 82-136752-iiiJPLREC, Cat Ex
5/19/2009GIPSY/RTG Software Support for Specialized Studies. JPL 82- 137132-ivJPLREC, Cat Ex
11/15/2002Delta 4 Launch Viewing2-ivKSCREC, Cat Ex
10/15/2001Expedition 2 Crew Tree Planting Ceremony2-ivKSCREC, Cat Ex
9/28/2010Activation of 90 Day Hazardous Waste Storage Site2-vKSCREC, Cat Ex, Checklist
6/21/2010Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR)/G-III Gulf Coast Oil Spill3-iDFRCREC, Cat Ex
4/18/2007Arctic Campaign, April 2007 through April 20123-iWFFREC, Cat Ex
12/23/2009ARRA Activities Associated with the Deformation, Ecosystem Structure, and Dynamics of Ice (DESDynl) HQ ID - 11483-iHQREC, Cat Ex, Checklist
11/8/08 and 12/16/08Mars Science Laboratory3-iLaRCREC, Cat Ex
4/20/2010Operation Ice Bridge3-iGSFCREC, Cat Ex
11/10/2008NASA Extragalactic Database (NED). JPL 79-8631 3-iJPLREC, Cat Ex
3/8/2010ARRA Soil Moisture Active/Passive Mission (SMAP)3-iJPLREC, Cat Ex
11/20/2009 and 11/18/09Body Wing Sensor for Testing Electrical Impedance3-iLaRCREC, Cat Ex
10/6/2009Propulsion Airframe Aerocoustics PAA3-iLaRCREC, Cat Ex
7/3/2010Subscale Diffuser Test, Prelim. Env. Study Control # 07/0843-iSSCREC, Cat Ex
9/4/2002Remediation Activities at MAF. Pilot Scale Testing of Remediation Technologies at MAF, to include Soil Hydrofracturing, Dense Non-Aqueous Phase Liquid Trench.3-iMSFCREC, Cat Ex
12/23/2009ARRA Funded Activities Associated with the HQ Fundamental Aeronautics Program HQ ID - 11193-iHQREC, Cat Ex, Checklist
7/7/2008Post Landing Orion Recovery Test (PORT)3-iKSCREC tiered off EIS ROD, Checklist
2/25/1999GTE PEM Tropics B DC-8 Payload Integration3-iDFRCREC, Cat Ex, Checklist
10/13/2000NASA DC-8 ARM-FIRE Water Vapor Experiment Mission (AFWEX)3-iDFRCREC, Cat Ex, Checklist
9/11/2008Moisture Active/Passive - Validation Experiment 2008 (SMAP VEX 08)3-iWFFREC, Cat Ex, Checklist
12/17/2008Hypergolic Propellent Destruction Evaluation3-iKSCREC, CatEx, Checklist
5/1/2003NASA DC-8 Airborne Laser Terrain Mapper (ALTM) Mission3-iDFRCREC, Cat Ex, Checklist
1/26/2010Modification and Operations at Building 4572 in Support of Ares Project3-iMSFCREC, Checklist
3/3/20082008 Sounding Rocket Program Office Launches3-iWFF, WSMR REC, Checklist based on EA
NO DATEARRA Funded Preliminary Design Activities Associated with the Soil Moisture Active and Passive (SMAP) Project HQ ID - 1163-iHQREC, Checklist
7/6/1998Phytoremediation Demonstration3-iKSCREC, Cat Ex
11/23/2009WB-57 Aileron Project3-iJSCREC, Cat Ex, Checklist
9/11/2008Moisture Active/Passive - Validation Experiment 2008 (SMAP VEX 08)3-iiWFFREC, Cat Ex, Checklist
3/28/2008ARCTAS Mission3-iiWFFREC, Cat Ex, Checklist
5/18/2006NASA Monsoon (NAMMA) Multidiscplinary Analysis3-iiWFFREC, Cat Ex, Checklist
5/14/2007Tropical Composition, Cloud, Climate Coupling (TC-4)3-iiWFFREC, Cat Ex, Checklist
3/3/20082008 Sounding Rocket Program Office Launches3-iiWFF, WSMR REC, Checklist based on EA
6/20/2008ICE Sat (Laser Research) EA/FONSI3-iiiGSFCEA/FONSI
1/22/2010Diode Laser as part of the Nuclei-Mode Aerosol-Size Spectrometer (NMASS)3-iiiDFRCLaser Safety Permit
1/22/2010Focused Cavity Aerosol Spectrometer (FCAS)3-iiiDFRCLaser Safety Permit
1/22/2010Tunable Diode Laser as part of the UAS Laser Hygrometer (ULH)3-iiiDFRCLaser Safety Permit
4/20/2010Operation Ice Bridge3-iiiGSFCREC, Cat Ex
11/19/2007Push Broom Laser Altimeter Demonstration3-iiiGSFCREC, Cat Ex
10/6/09 and 10/5/091064 nm Pump Laser Transmitter3-iiiLaRCREC, Cat Ex
2/12/2008USCG Laser Test Project, Direct Project TA 03-08 WON 105183483-iiiKSCRec, Cat Ex
3/28/2008ARCTAS Mission3-iiiWFFREC, Cat Ex, Checklist
5/18/2006NASA Monsoon (NAMMA) Multidiscplinary Analysis3-iiiWFFREC, Cat Ex, Checklist
5/14/2007Tropical Composition, Cloud, Climate Coupling (TC-4)3-iiiWFFREC, Cat Ex, Checklist
10/6/2009 and 10/5/09Develop Concepts of Operations for Air Traffic Management3-ivLaRCREC, Cat Ex
2/8/2010Transfer of Excess Property, 2 Forklifts4-iDFRCTransfer Order
10/20/2008AT&T Press Site Enhanced Use Lease4-iiKSCREC, Cat Ex
3/8/2010FPL Solar Power Expansion4-iiKSCREC, Cat Ex, Checklist
11/20/2007Lease Facility at Los Angeles World Airways Site 94-ii DFRCREC, Cat Ex
11/14/2007Reporting to GSA Excess Property on Santa Susana Field4-ivMSFCREC, Checklist
6/21/2010Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR)/G-III Gulf Coast Oil Spill5-iDFRCREC, Cat Ex
4/18/2007Arctic Campaign, April 2007 through April 20125-iWFFREC, Cat Ex
4/20/2010Operation Ice Bridge5-iGSFCREC, Cat Ex
10/31/2007Compliance for Lunar Reconnaissance Orbiter (LRO)5-iMSFCREC, Cat Ex
7/21/2009US Army Twin Otter Aircraft Out of DFRC5-iDFRCREC, Cat Ex
3/3/20082008 Sounding Rocket Program Office Launches5-iWFF, WSMR REC, Checklist based on EIS
11/10/20097685 Relocate Helicopter Operation from PAFB Hanger 751 to KSC SLF Hanger Project E11092605-iiKSCREC, Cat Ex
4/12/2007Global Hawk Air Vehicles5-iiDFRCREC, Cat Ex, Checklist
3/3/20082008 Sounding Rocket Program Office Launches5-iiWFF, WSMR REC, Checklist based on EIS