Follow this link to skip to the main content

NASA - National Aeronautics and Space Administration

  • NASA Home
  •     >    News & Features
  •     >    News Topics
  •     >    Shuttle and Station
    • Send
    • Follow this link to Share This PageShare

Browse Archive

  • Start
  • Backward
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • Forward
  • End
  • Space shuttle Atlantis waits to be lifted into High Bay 1 of the Vehicle Assembly Building

    Waiting for a Lift

    › View Image
  • Space shuttle Atlantis arrives in the Vehicle Assembly Building

    Atlantis Arrives for Stacking

    › View Image
  • Space shuttle Atlantis rolls to the Vehicle Assembly Building

    On the Move

    › View Image
  • Workers prepare space shuttle Atlantis for its move to the Vehicle Assembly Building

    Ready to Roll

    › View Image
  • A view of Atlantis' payload bay as the payload bay doors are closed

    Atlantis' Payload Bay

    › View Image
  • Atlantis' external tank is lowered into high bay 2

    Tank Meets Boosters

    › View Image
  • Atlantis' external tank is moved from the checkout cell into high bay 2

    Into the High Bay

    › View Image
  • The pump module orbital replacement unit is moved toward the EXPRESS Logistics Carrier

    Pump Module Moves Toward EXPRESS

    › View Image
  • Workers remove the reinforced-carbon carbon panels from Atlantis' wing leading edge

    RCC Panel Removal

    › View Image
  • Technicians guide the control moment gyroscope toward the small adapter plate assembly

    Guiding a Gyroscope

    › View Image
  • Start
  • Backward
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • Forward
  • End