<?xml version="1.0" encoding="UTF-8"?>
<feed xmlns:java_code="xalan://gov.nasa.build.Utils2" xmlns="http://www.w3.org/2005/Atom"><title>NASA Weekly Update Report Data</title><link href="http://www.nasa.gov/recovery"/><updated>2011-05-11T10:31:53 -0400</updated><id>tag:www.nasa.gov,2011-05-11:/recovery/2011/05/06/NASA_Weekly_Report_115</id><logo>http://www.nasa.gov/templateimages/redesign/modules/header/nasa_logo_100_75.png</logo><author><name>Barry Haworth</name><email>recovery@nasa.gov</email></author><entry xmlns:java_code="xalan://gov.nasa.build.Utils2"> <title>NASA Weekly Update Report Data</title> <link href="http://www.nasa.gov/recovery/reports/index.html"/> <id>tag:www.nasa.gov,2011-05-11:/recovery/2011/05/06/feed_115</id> <updated>2011-05-11T00:00:00 -0400</updated> <content type="html">&lt;table&gt; &lt;tbody&gt; &lt;tr&gt; &lt;td&gt;Agency Name: &lt;/td&gt; &lt;td colspan="4"&gt;(026) National Aeronautics and Space Administration &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;Week End Date: &lt;/td&gt; &lt;td colspan="4"&gt;06-May-2011 &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td colspan="4"&gt; &lt;br /&gt; &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;Agency / Bureau &lt;/td&gt; &lt;td&gt;TAFS &lt;/td&gt; &lt;td&gt;Sub-Account Code (OPTIONAL) &lt;/td&gt; &lt;td&gt;Award Type &lt;/td&gt; &lt;td&gt;US Indicator &lt;/td&gt; &lt;td&gt;State Code &lt;/td&gt; &lt;td&gt;Total Obligations &lt;/td&gt; &lt;td&gt;Total Gross Outlays &lt;/td&gt; &lt;td&gt;Direct or Reimbursable &lt;/td&gt; &lt;td&gt;Ordering TAFS &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;(026-00) National Aeronautics and Space Administration &lt;/td&gt; &lt;td&gt;(80-0119 2009 \ 2010) Science, Recovery Act &lt;/td&gt; &lt;td&gt; &#160; &lt;/td&gt; &lt;td&gt;Contracts and Orders (including modifications) &lt;/td&gt; &lt;td&gt;Y-US &lt;/td&gt; &lt;td&gt;&#160; &lt;/td&gt; &lt;td&gt;$394,740,283 &lt;/td&gt; &lt;td&gt;$363,347,768 &lt;/td&gt; &lt;td&gt;Direct &lt;/td&gt; &lt;td&gt;Not Applicable &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;(026-00) National Aeronautics and Space Administration &lt;/td&gt; &lt;td&gt;(80-0119 2009 \ 2010) Science, Recovery Act&#160; &lt;/td&gt; &lt;td&gt; &#160; &lt;/td&gt; &lt;td&gt; Cooperative Agreement &lt;/td&gt; &lt;td&gt;Y-US &lt;/td&gt; &lt;td&gt;CA-CALIFORNIA &lt;/td&gt; &lt;td&gt;$4,650,000 &lt;/td&gt; &lt;td&gt;$2,497,334 &lt;/td&gt; &lt;td&gt;Direct &lt;/td&gt; &lt;td&gt;Not Applicable &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td rowspan="1"&gt;(026-00) National Aeronautics and Space Administration &lt;/td&gt; &lt;td rowspan="1"&gt;(80-0119 2009 \ 2010) Science, Recovery Act&#160; &lt;/td&gt; &lt;td rowspan="1"&gt; &lt;br /&gt; &lt;/td&gt; &lt;td rowspan="1"&gt;Cooperative Agreement &lt;/td&gt; &lt;td rowspan="1"&gt;Y-US &lt;/td&gt; &lt;td rowspan="1"&gt;AL-ALABAMA &lt;br /&gt; &lt;/td&gt; &lt;td rowspan="1"&gt;$206,786 &lt;br /&gt; &lt;/td&gt; &lt;td rowspan="1"&gt;$136,540 &lt;br /&gt; &lt;/td&gt; &lt;td rowspan="1"&gt;Direct &lt;br /&gt; &lt;/td&gt; &lt;td rowspan="1"&gt;Not Applicable &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td rowspan="1"&gt;(026-00) National Aeronautics and Space Administration &lt;/td&gt; &lt;td rowspan="1"&gt;(80-0119 2009 \ 2010) Science, Recovery Act&#160; &lt;/td&gt; &lt;td rowspan="1"&gt; &lt;br /&gt; &lt;/td&gt; &lt;td rowspan="1"&gt;Cooperative Agreement &lt;/td&gt; &lt;td rowspan="1"&gt;Y-US &lt;/td&gt; &lt;td rowspan="1"&gt;MD-MARYLAND &lt;br /&gt; &lt;/td&gt; &lt;td rowspan="1"&gt;$293,144 &lt;br /&gt; &lt;/td&gt; &lt;td rowspan="1"&gt;$130,000 &lt;br /&gt; &lt;/td&gt; &lt;td rowspan="1"&gt;Direct &lt;br /&gt; &lt;/td&gt; &lt;td rowspan="1"&gt;Not Applicable &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;(026-00) National Aeronautics and Space Administration &lt;/td&gt; &lt;td&gt;(80-0121 2009 \ 2010) Cross Agency Support, Recovery Act &lt;br /&gt; &lt;/td&gt; &lt;td&gt; &#160; &lt;/td&gt; &lt;td&gt;Contracts and Orders (including modifications) &lt;/td&gt; &lt;td&gt;Y-US &lt;/td&gt; &lt;td&gt; &#160; &lt;/td&gt; &lt;td&gt;$49,999,255 &lt;/td&gt; &lt;td&gt;$49,794,268 &lt;/td&gt; &lt;td&gt;Direct &lt;/td&gt; &lt;td&gt;Not Applicable &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;(026-00) National Aeronautics and Space Administration &lt;/td&gt; &lt;td&gt;(80-0123 2009 \ 2010) Exploration, Recovery Act &lt;/td&gt; &lt;td&gt; &#160; &lt;/td&gt; &lt;td&gt;Contracts and Orders (including modifications) &lt;/td&gt; &lt;td&gt;Y-US &lt;/td&gt; &lt;td&gt;&#160; &lt;/td&gt; &lt;td&gt;$350,069,191 &lt;/td&gt; &lt;td&gt;$324,987,926 &lt;/td&gt; &lt;td&gt;Direct &lt;/td&gt; &lt;td&gt;Not Applicable &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt; (026-00) National Aeronautics and Space Administration &lt;/td&gt; &lt;td&gt;(80-0123 2009 \ 2010) Exploration, Recovery Act &lt;/td&gt; &lt;td&gt;&#160; &lt;/td&gt; &lt;td&gt;Other &lt;/td&gt; &lt;td&gt;Y-US &lt;/td&gt; &lt;td&gt;&#160; &lt;/td&gt; &lt;td&gt;$49,807,196 &lt;/td&gt; &lt;td&gt;$49,807,196 &lt;/td&gt; &lt;td&gt;Direct &lt;/td&gt; &lt;td&gt;Not Applicable &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;(026-00) National Aeronautics and Space Administration &lt;/td&gt; &lt;td&gt;(80‐0125 2009 \ 2010) Aeronautics, Recovery Act &lt;/td&gt; &lt;td&gt; &#160; &lt;/td&gt; &lt;td&gt;Contracts and Orders (including modifications) &lt;/td&gt; &lt;td&gt;Y-US &lt;/td&gt; &lt;td&gt;&#160; &lt;/td&gt; &lt;td&gt;$149,882,803 &lt;/td&gt; &lt;td&gt;$99,748,456 &lt;/td&gt; &lt;td&gt;Direct &lt;/td&gt; &lt;td&gt;Not Applicable &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;(026-00) National Aeronautics and Space Administration &lt;/td&gt; &lt;td&gt;(80-0121 2009 \ 2010) Cross Agency Support, Recovery Act &lt;/td&gt; &lt;td&gt;&#160; &lt;/td&gt; &lt;td&gt;Contracts and Orders (including modifications) &lt;/td&gt; &lt;td&gt;&#160; Y-US &lt;/td&gt; &lt;td&gt;&#160; &lt;/td&gt; &lt;td&gt;$47,472,480 &lt;/td&gt; &lt;td&gt;$36,995,764 &lt;/td&gt; &lt;td&gt;Reimbursable &lt;/td&gt; &lt;td&gt;(13-1454 2009/2010) Procurement, Acquisition, and Construction Recovery Act &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;(026-00) National Aeronautics and Space Administration &lt;/td&gt; &lt;td&gt;(80-0121 2009 \ 2010) Cross Agency Support, Recovery Act &lt;/td&gt; &lt;td&gt;&#160; &lt;/td&gt; &lt;td&gt;Other&#160; &lt;br /&gt; &lt;/td&gt; &lt;td&gt;&#160; Y-US &lt;/td&gt; &lt;td&gt;&#160; &lt;/td&gt; &lt;td&gt;$108,705 &lt;/td&gt; &lt;td&gt;$108,705 &lt;/td&gt; &lt;td&gt;Reimbursable &lt;/td&gt; &lt;td&gt;(89-0336 2009/2010) Energy Transformation Acceleration Fund, Recovery Act &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td colspan="4"&gt; &lt;br /&gt; &lt;table&gt;&lt;tbody&gt; &lt;/tbody&gt; &lt;/table&gt; &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;Major Completed Actions &lt;/td&gt; &lt;td colspan="9"&gt; &lt;br /&gt; &lt;li&gt;NASA completed all awards of Science, Exploration, Cross-Agency Support, and Aeronautics contracts and cooperative agreements in accordance with applicable Program Plans and Recovery Act provisions, and more than 88% of funds appropriated have been disbursed for those projects. &lt;br /&gt; &lt;/li&gt; &lt;li&gt;Aeronautics: Aeronautics Test Program at the Ames Research Center (ARC) has completed the Compressor Reactivation Project and the compressor is being transitioned into operating status as breaks in the tunnel test schedule permits. &lt;/li&gt; &lt;li&gt;Science: For Earth Science Research and Analysis, the Terrestrial Observation and Prediction System (TOPS) Irrigation continued deployment of the sensor network instruments in lysimeter field, transplanted processing tomato crop with USDA and CSU Fresno, completed repairs to lysimeter irrigation system, and initiated lysimeter experiment and began deploying surface renewal instrumentation; for Airborne Science, the WB-57 aircraft ribs, spars, and clips for the honeycomb panels were completed and are ready for assembly including for IceBridge where the first 2010-2011 data delivery was made to the National Snow and Ice Data Center (NSIDC) and includes Level 0, gravity, magnetics, positioning and laser data; for Venture Class, the Carbon in Arctic Reservoirs Vulnerability Experiment (CARVE) on the Twin Otter aircraft team was ferried down from Fairbanks, AK to Idaho where flights were performed over Salt Lake City and a brush fire in Northern Utah, as well as performing radiometer calibration data analysis over the Great Salt Lake and Lake Utah. &lt;/li&gt; &lt;li&gt;Cross-Agency Support for Hurricane Damage Repair Projects at the Johnson Space Center (JSC): NASA continues to support a performance audit on the Cross-Agency Support JSC Hurricane Repair activities which began on August 31st. &lt;/li&gt; &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td colspan="4"&gt; &lt;br /&gt; &lt;br /&gt; &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td&gt;Major &lt;br /&gt;Planned Actions &lt;/td&gt; &lt;td colspan="9"&gt; &lt;li&gt;NASA will continue providing quality assurance of Recipients during the period in May. &lt;br /&gt; &lt;/li&gt; &lt;li&gt;Aeronautics: Supersonics at GRC test planning and preparation will continue in support of May wind tunnel testing, and IRT Refrigeration and Tunnel HEX Project Controls system factory acceptance test planned TBD at the Tullahoma, TN, Facility. &lt;br /&gt; &lt;/li&gt; &lt;li&gt;&#160;Science: Continue in May the Earth Research Science, Terrestrial Observation and Prediction System (TOPS) Irrigation, coordination with USDA &amp; CSU Fresno regarding ongoing maintenance of experiment and deployment of additional soil moisture instrumentation in tomato field with partner grower; Venture Class Carbon in Arctic Reservoirs Vulnerability Experiment (CARVE) flight planning for the June Oklahoma flights; Airborne Science Airborne Microwave Observatory of Sub-canopy and Subsurface (AirMOSS) radar performance trade study; WB-57 ailerons effort; and the Earth Science Research and Analysis Virtual Terrestrial Observation and Prediction System (V-TOPS) software integration task. &lt;br /&gt; &lt;/li&gt; &lt;li&gt;Cross-Agency Support for Hurricane Damage Repair Projects at the Johnson Space Center (JSC): All CAS restoration projects are completed; no additional repairs are planned. &lt;/li&gt; &lt;li&gt;Exploration: The ARES (Upper Stage) Vertical Assembly Tool software coding will continue in May. &lt;br /&gt; &lt;/li&gt; &lt;/td&gt; &lt;/tr&gt; &lt;/tbody&gt; &lt;/table&gt;</content> </entry></feed>