MLAS is Assembled and is Waiting Transportation for Launch.
 |
| The Motor Cage Assembly with installed inert MK70 Motors (white tubes) and thrust plate (silver disk) can be seen inside the Boost Skirt. In back is the Forward Fairing assembly. |
 |
| The Coast Skirt (white component above gold ring) is assembled on to the Boost Skirt (below gold ring). |
 |
| Technicians assemble a transportation fixture that will be used to transport MLAS components from the processing facility to the launch pad. |
 |
| The Forward Fairing (top) being fitchecked on to the Coast Skirt. Bridle Lines from the Turnaround Drogue Parachute System can be seen at the top of the Forward Fairing. The Boost Skirt with the top section of the Motor Cage Assembly can be seen in the background on the right. |
 |
| Major components of the MLAS Flight Test Vehicle. In back is the Boost Skirt with a portion of the Motor Cage Assembly protruding over the gold-colored frangible joint. In the foreground, clockwise from the top, is the Forward Fairing, Crew Module Simulator, and Coast Skirt. The Forward Fairing has just completed fitcheck with the Coast Skirt. |