Reports

Text Size

NAOMS Survey Responses
12.31.07
 
This website contains responses collected from the air carrier and general aviation pilot surveys as part of the NASA National Aviation Operational Monitoring Service (NAOMS) project from April 2001 through December 2004.

NOTE: The responses contained herein, and the methodology used to acquire them, have not been peer-reviewed to date. Accordingly, no product of the NAOMS project, including the survey methodology, the survey responses, and any analysis of the responses, should be viewed or considered at this stage as having been validated.

Air Carrier Survey Responses (Updates and Additions, Feb. 6, 2008)
The redacted responses collected from surveys of air carrier pilots between April 2001 and December 2004 and a portion of the actual or raw survey responses collected to show the breadth and scope of the pilot community surveyed and the types of aircraft flown.

General Aviation Survey Responses (Updates and Additions, Feb. 6, 2008)
The redacted responses collected from surveys of general aviation pilots between April 2001 and December 2004 and a portion of the actual or raw survey responses collected to show the breadth and scope of the pilot community surveyed and the types of aircraft flown.

Main NAOMS Page